Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Dynamically managing hot water systems in South Australia

24 Feb, 2023
hot water



The Australian Renewable Energy Agency (ARENA) has announced $2.72 million in funding to PLUS ES to develop Hot Water Control Load demand management capability (the Portal) that will allow its project partner AGL Energy to access and manage up to 20,000 hot water systems in South Australia via their smart meter – a potential controllable load of up to 48 MW.

AGL Energy will control the hot water load to maximise benefits from the optimisation of hot water demand and take advantage of SA Power Network’s ‘solar sponge’ Time-of-Use tariff that incentivises daytime usage of electricity to enable higher renewable energy generation.

The $5.4 million project will demonstrate dynamic load control management via Metering Services API, while also helping to inform the design of network controlled load tariffs in locations outside South Australia, and other retail products. Customers with electric hot water systems and time of use tariffs are also expected to see the benefits through cheaper energy prices as their load is shifted into the midday solar sponge period.

Electric hot water systems are currently the largest and most predictable load within the residential sector, which offers significant potential for dynamic load control. Traditionally scheduled to operate during night time off-peak periods, dynamic load control enables the ability to turn systems on or off depending on market and network signals, particularly in the middle of the day when rooftop solar generation is at its peak.

By demonstrating orchestration of hot water at a meaningful scale, the $5.4 million project aims to provide a pathway to scale-up hot water control in other jurisdictions outside South Australia.

If the project is successful, PLUS ES may expand the Portal to be made available to all of their meters in the National Electricity Market (NEM) and eventually to inform a new approach for all off-peak electric hot water systems where a smart meter is installed.

ARENA CEO Darren Miller said hot water control has been identified as a low cost solution that could help to address minimum system demand issues across the NEM.

“With the right innovation and technology solutions, we can reduce the need for costly network infrastructure upgrades and make the most of the increasing amounts of low-cost clean energy that we see entering the market.

“The program with PLUS ES and AGL will show how dynamically managing hot water systems presents a scalable solution for controlling a large source of electricity demand in a smarter way that benefits both the customer and retailer.”

The project is expected to be completed in late 2024.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Horizons Clean Energy Expansion Week 2026

Horizons Clean Energy Expansion Week 2026

All Energy Australia

All Energy Australia

smart energy south australia

Smart Energy South Australia

Energy Storage Summit Asia 2026

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required