Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Regulator suspends South Australian solar installer over subpar work

20 Nov, 2026



The Clean Energy Regulator (CER) has barred a South Australian solar installer from participating in a major federal renewable energy rebate scheme for five months, escalating its nationwide crackdown on poor workmanship.

Accredited installer David Mogg has been declared ineligible to install solar PV or battery systems under the Small-scale Renewable Energy Scheme (SRES). As a result, any systems installed by Mogg during the five-month suspension period will not qualify for small-scale technology certificates (STCs).

The enforcement action follows multiple inspections of Mogg’s solar PV and battery installations, which revealed repeated failures to meet Australian standards and scheme requirements. Under Regulation 47 of the Renewable Energy (Electricity) Regulations 2001, the CER can disqualify installers from the scheme if they record adverse inspection findings on three separate occasions.

The suspension operates independently of any disciplinary measures that state authorities or industry accreditation bodies may pursue.

CER Chair Tony Chappel said the regulator had repeatedly warned the sector that it would act decisively against unsafe and non-compliant installations.

“Our inspection reports and letters clearly set out what needs to improve and warn that further compliance action may follow,” Chappel said.

“If that advice is not taken seriously and issues continue, we will act.”

Since 1 July 2025, the regulator has contacted more than 830 installers regarding adverse inspection results. That outreach includes 718 initial advisory letters for first-time breaches and 121 formal warning letters for repeated non-compliance.

Chappel urged retailers and tradespeople across the industry to “do it once and do it well”, warning that substandard work will be detected and must be rectified at the installer’s expense.

“We’re watching closely to ensure continuous improvement across the industry,” he said.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 Nov

Regulator suspends South Australian solar installer over subpar work

20 Nov

Edify files Queensland solar and battery project for EPBC approval

20 Nov

Australia’s wind and battery build-out hits record level as states move towards 2030 targets

19 Nov

Norway’s ‘green battery’ status threatened by narrowing power surplus, report warns

17 Nov

Frontier Energy breaks ground on Waroona solar and battery project in WA

20 Nov

New research shows sea salt holds key to safer household hydrogen appliances

18 Nov

CCAA outlines roadmap to accelerate low-carbon concrete

17 Nov

WA invests in Cockburn Sound seagrass restoration ahead of new container port

13 Nov

Cities outpace national governments on climate targets: new report

13 Nov

NSW sustainable cities awards celebrate Hawkesbury Council’s achievements

20 Nov

WA Parliamentary inquiry urges green iron priority as trading partners move to net zero

20 Nov

Advocates call for climate levy as Australia ranks as third-largest carbon exporter

19 Nov

Australia challenged over coal and gas expansion at COP31

19 Nov

Australia and South Korea sign bilateral decarbonisation pathway

17 Nov

Asahi Kasei, Circularise, and Furuya Metal launch precious metals traceability trial

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required