Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Woodside’s influence deepens environmental integrity concerns

23 Feb, 2026
Image courtesy for Greenpeace


Newly released government documents have intensified scrutiny of Woodside Energy’s environmental conduct, raising further questions about the company’s integrity as Western Australia’s Environmental Protection Authority (EPA) prepares to deliver its recommendation on the Browse gas project.

The documents, published today by Nine Papers and accessed under Freedom of Information (FOI) laws, show that Woodside lobbied the federal government to weaken conditions imposed on its North West Shelf gas extension in September.

The revelation comes as the WA EPA moves closer to announcing its position on the company’s long-planned Browse gas field development, a project critical to supplying the North West Shelf facility.

The North West Shelf extension has been widely criticised as one of Australia’s most polluting fossil fuel projects.

Its approval last year came with environmental conditions designed to mitigate rising emissions, but the FOI material suggests Woodside sought to reduce its accountability shortly after those measures were introduced.

The timing of these revelations amplifies concerns about the company’s influence over decision-making, especially as the Browse project faces renewed environmental hurdles.

In 2024, earlier FOI documents revealed that the WA EPA was preparing to reject Browse, citing “unacceptable impacts” on Scott Reef — Australia’s largest oceanic reef system and home to diverse marine life, including endangered species.

Environmental advocates argue that the new information solidifies a pattern of disregard for ecological and regulatory boundaries.

Greenpeace Australia Pacific Senior Campaigner Gemma Plesman said: “How was Woodside able to self-appoint as the judge, jury and executor of the North West Shelf, one of Australia’s dirtiest and most polluting fossil fuel projects?

“The level of influence and interference is chilling and is a sign of what to expect from Woodside.

“Woodside has been playing dirty, attempting to write its own rules about one of the most consequential and controversial fossil fuel projects on Australia’s books.”

The EPA’s impending recommendation on Browse, expected within weeks, will serve as a critical test case for how regulators manage the persistent tension between fossil fuel expansion and climate obligations.

The agency has reviewed multiple revisions to the project, most recently in 2025, but concerns about ecological impacts remain central to public and scientific opposition.

“All eyes are now on the WA EPA, which is about to hand down its recommendation on the Browse project,” Plesman said.

“Woodside has revised its Browse plans multiple times – most recently in 2025, but the reality is: Woodside still wants to drill more than 50 gas wells around Scott Reef, and their plans still threaten some of our ocean’s most vulnerable species like endangered pygmy blue whales and green turtles, and still risk oil spills, seismic blasting and reef sinking.”

She added: “Clearly, Woodside can’t be trusted.

“It has been desperately trying and failing for years to get Browse off the ground and will do anything it can to push the plans ahead, and the North West Shelf scandal is proof.

“The EPA must recommend rejecting this proposal, and the WA government must put an end to this shoddy project.”

As the EPA finalises its assessment, pressure is mounting on both regulators and the WA government to demonstrate independence amid growing public scrutiny of Woodside’s environmental track record.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required