Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Renewables to power Rio Tinto’s most advanced iron ore mine

21 Jun, 2022
advanced



Rio Tinto has opened the Gudai-Darri project in Western Australia, the company’s most technologically advanced iron ore mine in the Pilbara.  

Since development began in April 2019, 14 million work hours have culminated in the delivery of Rio Tinto’s 17th iron ore mine, which has a capacity of 43 million tonnes per annum.

Gudai-Darri features some of the most advanced cutting-edge technology, including a robotic ore sampling laboratory which provides visibility of the ore grades out of the mine within minutes.

There are autonomous trucks, trains and drills, which are standard across many of Rio Tinto’s Pilbara mines, and a digital replica of the processing plant which allows teams to quickly test different situations digitally before implementing.

With an expected mine life of more than 40 years, Gudai-Darri expects to increase iron ore production volumes from the second half of this year and reach capacity in 2023.

Rio Tinto is building a 34 megawatt solar farm consisting of 83,000 solar panels that will power one-third of Gudai-Darri’s electricity needs, with completion expected in August 2022.

The iron ore miner also has plans to develop a one gigawatt solar and wind power operation in the Pilbara, which could be seven times bigger than Western Australia’s largest solar farm.

Mines and Petroleum and Energy Minister Bill Johnston said he is impressed by Rio Tinto’s innovation and sustainability – saying the mine  is a prototype of the mine of the future.

“Once the new solar farm is complete, it will be able to power one-third of Gudai-Darri’s operational needs with renewable energy.

“This will reduce carbon dioxide emissions by 90,000 tonnes a year, which is the same amount produced by 6,000 Australian homes each year.”

Pilbara MLA Kevin Michel said Rio Tinto’s plans to use more renewables to support its operations at this newly opened mine is commended.

“The development and construction of these solar and wind projects will also support job opportunities and be a boost to the local Pilbara economy.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
14 Jan

Solar and wind farms spill power amid oversupply

14 Jan

Neoen advances 500 MW Wheatbelt wind project

12 Jan

First stage of Eraring battery starts commercial operations

09 Jan

Japan’s first floating offshore wind farm starts operations

09 Jan

Vestas powers South Australia’s clean future

14 Jan

2025 marked peak Green Star sustainability in Australian buildings

19 Dec

RICS report shows AI could boost green infrastructure

17 Dec

CEFC urges investors to lead green data centres growth

12 Dec

Queensland offers renters, landlords rebates for solar power use

12 Dec

NSW government grants $25.45M to reduce cement emissions

14 Jan

‘Breathing batteries’ store energy and carbon

14 Jan

New project advances Iron Nitride magnet production

19 Dec

Airbridge secures AU$1.5 million grant for carbon dioxide capture project

19 Dec

Study finds Australian organisations place technology central to climate action

15 Dec

Flinders University researchers search solutions for mine waste

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required