Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Queenslanders to have their say on Gladstone H2-Hub project

18 Aug, 2022
H2-Hub



Queenslanders can now have their say on the H2-Hub™ Gladstone proposal to develop a $4.7 billion green hydrogen and green ammonia production and export facility at Yarwun, near Gladstone.

Queensland’s Coordinator-General has now released draft terms of reference for the H2-HubTM Gladstone project’s environmental impact statement (EIS).

Deputy Premier and Minister for State Development Steven Miles said it is an exciting project for Central Queensland and for the state’s future as an emerging hydrogen superpower.

“H2U estimates the project will create over 550 jobs during construction, with up to 350 jobs during the peak construction phase, and 140 ongoing operational jobs.

“I announced in April that the project had been declared a coordinated project and that H2U and Orica had made a strategic partnership agreement to initiate the project’s first phase. This is another step forward.”

The H2-Hub™ Gladstone project has a planned capacity of up to 3 gigawatts of electrolysis and up to 5,000 tonnes per day of green ammonia production.

Minister for Energy, Renewables and Hydrogen Mick de Brenni said the H2U facility is expected to use 100 per cent renewable energy from new-build solar and wind resources in the Queensland region.

“Projects like this help to propel Queensland towards becoming a clean energy powerhouse,” Mr de Brenni said.

“Throughout the state, we are seeing enormous activity because Queensland could have as much as 40 per cent of Australia’s hydrogen production by 2040.”

Hydrogen Utility (H2U) is proposing a two-stage development to create a major new industrial hub in the Gladstone State Development Area with export infrastructure at Fisherman’s Landing Wharf, Port of Gladstone.

The H2-Hub™ Gladstone project has a planned capacity of up to 3 gigawatts of electrolysis and up to 5,000 tonnes per day of green ammonia production. It is expected the proposed facility will use 100 per cent renewable energy from new-build solar and wind resources in the Queensland region.

Subject to approvals, H2U proposes to begin stage-one construction in 2023 with production commencing towards the end of 2025.

The public can have their say on the EIS’s draft terms of reference until 5pm on 13 September 2022.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

7th European Conference Hydrogen & P2X 2026

7th European Conference Hydrogen & P2X 2026

World Hydrogen 2026

World Hydrogen 2026 Summit and Exhibition

Hydrogen

Hydrogen Conference

China International Hydrogen Congress and Expo (CIHC 2026)

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 Nov

Regulator suspends South Australian solar installer over subpar work

20 Nov

Edify files Queensland solar and battery project for EPBC approval

20 Nov

Australia’s wind and battery build-out hits record level as states move towards 2030 targets

19 Nov

Norway’s ‘green battery’ status threatened by narrowing power surplus, report warns

17 Nov

Frontier Energy breaks ground on Waroona solar and battery project in WA

24 Nov

City of Sydney switches Prince Alfred Park Pool heating to electric

20 Nov

New research shows sea salt holds key to safer household hydrogen appliances

18 Nov

CCAA outlines roadmap to accelerate low-carbon concrete

17 Nov

WA invests in Cockburn Sound seagrass restoration ahead of new container port

13 Nov

Cities outpace national governments on climate targets: new report

24 Nov

Australian climate groups urge halt of new coal approvals as COP31 talks collapse

23 Nov

New national research hub to advance Australia’s clean energy manufacturing

20 Nov

WA Parliamentary inquiry urges green iron priority as trading partners move to net zero

20 Nov

Advocates call for climate levy as Australia ranks as third-largest carbon exporter

19 Nov

Australia challenged over coal and gas expansion at COP31

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required