Subscribe to Newsletter
  • ACQUIRE
  • JAPAN ENERGY SUMMIT

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Vena Energy to bring South Australian hybrid project online in 2023

20 Jul, 2022
DCIM107MEDIADJI_0375.JPG


Vena Energy has reached financial close for the Tailem Bend 2 Hybrid Project, its first combined solar and battery energy storage system (BESS) project in South Australia.

The project is the company’s first operational system to aggregate solar generation and battery storage, following its success of the first stage of the Tailem Bend Solar Project which has been operational since 2019.

Upon completion, the project will have a capacity of 128.5 MW derived from the 87 MW solar project and the 41.5 MW BESS. The solar project will be capable of supplying approximately 35,000 homes with clean energy annually, reducing more than 207,000 tonnes of CO2 greenhouse gas emissions, or the equivalent of planting more than 3.4 million trees.

Mr Owen Sela, Head of Vena Energy Australia said their mission is to accelerate the energy transition across the Asia-Pacific region, and the Tailem Bend BESS is an example of this shift.

“In Australia we have around 5 GW of renewable energy projects in the pipeline, accommodating the demand for clean, reliable energy sources. There has been a needed shift to green energy in recent years, and we are committed to work alongside our local communities and stakeholders to deliver affordable and clean electricity to our customers.”

Vena Energy has appointed UGL Limited as its engineering, procurement, and construction (EPC) contractor who will deliver the second stage of the solar project, and Doosan GridTech as the head contractor for the BESS.

Construction of the solar project commenced in April 2022, and the BESS project will commence later in the year.

The hybrid project will employ up to 200 staff during construction, with a keen focus on encouraging local employment outcomes.

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 May

Snowy 2.0 workers strike over pay disparity

16 May

Long-duration batteries key to renewable reliability

16 May

Rural not-for-profits drive clean energy in regional Australia

13 May

NSW unveils 10 Central-West Orana renewables projects

13 May

Australia’s grid hits record 43 per cent renewables in 2025

13 May

ResiLoop drives Melbourne flooring waste recycling revolution

13 May

Melbourne housing growth exposes environmental crisis

08 May

NABERS SPI 2025 launches milestone

29 Apr

Salta achieves first 5-Star Green Star industrial milestone

28 Apr

GCCA launches world’s first low carbon ratings system

13 May

Queensland resources sector drives energy transition

08 May

Global energy mix shifts slowly toward fuel alternatives

08 May

Clean energy mineral rush fuels rights abuses

29 Apr

Mitsui invests $1b in US low-carbon ammonia project

24 Apr

Collie’s industrial transformation accelerates with major project milestones

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required