Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Vena Energy to bring South Australian hybrid project online in 2023

20 Jul, 2022
DCIM107MEDIADJI_0375.JPG


Vena Energy has reached financial close for the Tailem Bend 2 Hybrid Project, its first combined solar and battery energy storage system (BESS) project in South Australia.

The project is the company’s first operational system to aggregate solar generation and battery storage, following its success of the first stage of the Tailem Bend Solar Project which has been operational since 2019.

Upon completion, the project will have a capacity of 128.5 MW derived from the 87 MW solar project and the 41.5 MW BESS. The solar project will be capable of supplying approximately 35,000 homes with clean energy annually, reducing more than 207,000 tonnes of CO2 greenhouse gas emissions, or the equivalent of planting more than 3.4 million trees.

Mr Owen Sela, Head of Vena Energy Australia said their mission is to accelerate the energy transition across the Asia-Pacific region, and the Tailem Bend BESS is an example of this shift.

“In Australia we have around 5 GW of renewable energy projects in the pipeline, accommodating the demand for clean, reliable energy sources. There has been a needed shift to green energy in recent years, and we are committed to work alongside our local communities and stakeholders to deliver affordable and clean electricity to our customers.”

Vena Energy has appointed UGL Limited as its engineering, procurement, and construction (EPC) contractor who will deliver the second stage of the solar project, and Doosan GridTech as the head contractor for the BESS.

Construction of the solar project commenced in April 2022, and the BESS project will commence later in the year.

The hybrid project will employ up to 200 staff during construction, with a keen focus on encouraging local employment outcomes.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

smart energy south australia

Smart Energy South Australia

Smart Energy South Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 Nov

Regulator suspends South Australian solar installer over subpar work

20 Nov

Edify files Queensland solar and battery project for EPBC approval

20 Nov

Australia’s wind and battery build-out hits record level as states move towards 2030 targets

19 Nov

Norway’s ‘green battery’ status threatened by narrowing power surplus, report warns

17 Nov

Frontier Energy breaks ground on Waroona solar and battery project in WA

20 Nov

New research shows sea salt holds key to safer household hydrogen appliances

18 Nov

CCAA outlines roadmap to accelerate low-carbon concrete

17 Nov

WA invests in Cockburn Sound seagrass restoration ahead of new container port

13 Nov

Cities outpace national governments on climate targets: new report

13 Nov

NSW sustainable cities awards celebrate Hawkesbury Council’s achievements

20 Nov

WA Parliamentary inquiry urges green iron priority as trading partners move to net zero

20 Nov

Advocates call for climate levy as Australia ranks as third-largest carbon exporter

19 Nov

Australia challenged over coal and gas expansion at COP31

19 Nov

Australia and South Korea sign bilateral decarbonisation pathway

17 Nov

Asahi Kasei, Circularise, and Furuya Metal launch precious metals traceability trial

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required