Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Vena Energy to bring South Australian hybrid project online in 2023

20 Jul, 2022
DCIM107MEDIADJI_0375.JPG


Vena Energy has reached financial close for the Tailem Bend 2 Hybrid Project, its first combined solar and battery energy storage system (BESS) project in South Australia.

The project is the company’s first operational system to aggregate solar generation and battery storage, following its success of the first stage of the Tailem Bend Solar Project which has been operational since 2019.

Upon completion, the project will have a capacity of 128.5 MW derived from the 87 MW solar project and the 41.5 MW BESS. The solar project will be capable of supplying approximately 35,000 homes with clean energy annually, reducing more than 207,000 tonnes of CO2 greenhouse gas emissions, or the equivalent of planting more than 3.4 million trees.

Mr Owen Sela, Head of Vena Energy Australia said their mission is to accelerate the energy transition across the Asia-Pacific region, and the Tailem Bend BESS is an example of this shift.

“In Australia we have around 5 GW of renewable energy projects in the pipeline, accommodating the demand for clean, reliable energy sources. There has been a needed shift to green energy in recent years, and we are committed to work alongside our local communities and stakeholders to deliver affordable and clean electricity to our customers.”

Vena Energy has appointed UGL Limited as its engineering, procurement, and construction (EPC) contractor who will deliver the second stage of the solar project, and Doosan GridTech as the head contractor for the BESS.

Construction of the solar project commenced in April 2022, and the BESS project will commence later in the year.

The hybrid project will employ up to 200 staff during construction, with a keen focus on encouraging local employment outcomes.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

smart energy south australia

Smart Energy South Australia

Smart Energy South Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Jun

Ark Energy secures grid connection for Richmond Valley project

08 Jun

Regional Queensland power prices to fall as investment in batteries and renewables grows

05 Jun

Frontier secures $110M equity raising for Waroona solar battery project

05 Jun

Australian households lead world on battery and solar adoption

05 Jun

UNSW solar pioneer backs perovskites in push beyond silicon limits

04 Jun

Researchers create yeast-based bio material for buildings

28 May

Europe’s insulated homes are failing in the heat

25 May

Victoria tightens insulation rules to improve retrofit practices

20 May

All tiers of government invest $54M in Queensland’s organic waste processing

20 May

Albany’s electrification extended with gas phase‑out delayed to 2027

08 Jun

Australian government needs to prioritise trade deals to support green iron ore sector

05 Jun

BHP and GCMD trial multi-feedstock biofuel to decarbonise shipping

05 Jun

WA government invests in solar and battery recycling to recover critical minerals

29 May

MGA Thermal starts FEED study for Australia’s largest industrial thermal storage project

28 May

Traditional Owners and BHP to explore Pilbara-wide renewable network

  • Smart Energy south australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • Flow Batteries

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required