Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Solar panel installers on notice in safety blitz

02 Mar, 2021
Image: A young technician installing solar panels on a factory roof.


Installers of rooftop solar panels can expect an unannounced visit from SafeWork NSW’s inspectors as the work health and safety regulator targets heightened risk associated with a boom in demand.

Minister for Better Regulation, Kevin Anderson, said with state and federal government rebates stimulating an increase in solar panel rooftop installations, SafeWork is intent on ensuring the industry puts safety first.

“Last year we saw around 90,000 installations across the state and no doubt there will be even more this year, as many of us look at new ways to reduce costs of living,” Minister Anderson said.

Installing solar systems exposes workers to risks of serious injury, including through falls from ladders, roofs and skylights, as well as electrical risks.

“While our focus is on proactively raising awareness of safe practices, we will be taking a zero-tolerance approach to those who put workers’ lives at risk by not using the right safety gear or conducting work without a licence,” the Minister said.

He noted that a new workplace safety guide for the industry has been developed in consultation with the Clean Energy Council, the NSW Department of Planning, Industry and Environment and other key representatives.

The safety guide provides the solar industry with clear direction on controlling risk, including a simple safety checklist for people working in the industry, instructions on developing a site-specific safe work method statement and minimum fall protection measures.

“Businesses that sell, design and install solar systems have duties to provide and maintain a working environment that is safe for every worker,” Minister Anderson stated.

“One thing that we’ve got to stress is that no solar installer should be working on a roof without fall protection in place. If you see this happening, please contact SafeWork NSW immediately via the hotline, or the Speak Up app.”

Solar installers face on-the-spot fines of up to $720 for individuals and $3,600 for businesses for not protecting workers from falls from heights and electrical risks.

SafeWork will also be holding safety information events online for solar installers and workers, who can access the $500 small business safety rebate after attending to upgrade safety equipment.

 

For more information:

  • SafeWork NSW Solar installation safety
  • Guide to Safe Solar Panel Installation

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

18th Solar PV & Energy Storage World EXPO

18th Solar PV & Energy Storage World EXPO

Solar and Storage Live

Solar and Storage Live

Solar & Energy Storage Summit 2025

Solar & Energy Storage Summit 2025

SOLAR AND STORAGE LIVE QUEENSLAND

SOLAR AND STORAGE LIVE QUEENSLAND

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Jul

NSW approves $1.8B project to turn former coal site into hydro, solar hub

15 Jul

Enphase Energy launches microinverter for solar roofs to Australia and New Zealand

15 Jul

Port of Newcastle becomes first NSW port approved for battery storage

14 Jul

SEC and Energy Dome to develop Victoria’s first long-duration carbon dioxide battery

10 Jul

NSW invests $25M to build the clean energy workforce

15 Jul

How Bradmill townhomes halved energy use for residents

07 Jul

First Nations cultural centre wins biophilic design awards

29 Jun

Climate report warns UK buildings are not cutting emissions

25 Jun

New AI platform expands solar access in apartments

24 Jun

CAGBC formalises board to guide sustainable building future

15 Jul

NSW, federal governments invest $5M for Hunter mining land reuse

15 Jul

Queensland invests $6M to back landholders in protecting wildlife habitats

15 Jul

Channel Infrastructure advances Marsden Point biorefinery plans

15 Jul

Hydrogen future hinges on materials not production, review finds

10 Jul

Queensland invests in state-of-the-art biofuels hub in Brisbane

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required