Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Maoneng Australia invests $150 million in Gould Creek battery project

06 Nov, 2021
Gould Creek



South Australia’s largest battery storage project to date will create 160 jobs and power up to 40,000 homes, with the State Government granting development approval to Maoneng Australia’s $150 million, 225MW project at Gould Creek.

Maoneng Australia’s $150 million investment in its 225MW Gould Creek Battery Energy Storage System (BESS) will see the company power 40,000 homes during peak hour, once completed in 2023.

Located just 22 kilometres outside Adelaide and covering approximately 3.4 hectares of land, the project is expected to take 12 months to complete and will provide up to 160 construction jobs and two full time maintenance positions once construction is complete.

The Gould Creek BESS will store approximately 450MWh of electricity and will embed electricity generation to supply into the Australian grid and support South Australia’s commitment to reducing greenhouse gas emissions to meet our clean energy transition.

Minister for Trade and Investment Stephen Patterson said South Australia’s credentials to produce around 60 per cent of the state’s energy capacity from renewable sources, is helping to attract further investment.

“This is a significant investment by Maoneng Australia into South Australia’s continuing commitment towards a sustainable future and I’m delighted to see an Australian-owned company that is so committed to the development of projects that are critical for powering a sustainable world.

South Australia is one of the most developed regions in the world in terms of battery storage infrastructure. In addition, the State Government is promoting the development of next-generation energy industries, including battery storage, solar, wind and hydrogen.

Allison Hawke, Director of Development at Maoneng Australia said the Gould Creek BESS will provide stability to the South Australian grid by allowing more reliable and steady electricity dispersion throughout peaks and troughs in energy demand and supply.

“The rise in cheap, renewable energy is inevitable and will come sooner than forecast. The South Australian Government has, and continues to be, ahead of the curve in embracing this technology and the direct and indirect jobs, skills and business opportunities that this new industry offers,” Ms Hawke said. “Maoneng is excited to be amongst the early movers in this era of change.

“Throughout the construction phase of the project, around 140 to 160 jobs will be needed. This phase will last for between nine to 12 months. A commercial benefit of battery and other forms of renewable energy is that the ongoing operation can be managed remotely. There will be an on-site control centre and maintenance facilities.

“Maoneng is in talks with the Industry Capability Network to make sure local businesses and contractors can be positioned to capitalise on local job and business opportunities.”

The Gould Creek BESS project is expected to be in operation in the second quarter of 2023.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Jul

NSW approves $1.8B project to turn former coal site into hydro, solar hub

15 Jul

Enphase Energy launches microinverter for solar roofs to Australia and New Zealand

15 Jul

Port of Newcastle becomes first NSW port approved for battery storage

14 Jul

SEC and Energy Dome to develop Victoria’s first long-duration carbon dioxide battery

10 Jul

NSW invests $25M to build the clean energy workforce

15 Jul

How Bradmill townhomes halved energy use for residents

07 Jul

First Nations cultural centre wins biophilic design awards

29 Jun

Climate report warns UK buildings are not cutting emissions

25 Jun

New AI platform expands solar access in apartments

24 Jun

CAGBC formalises board to guide sustainable building future

15 Jul

NSW, federal governments invest $5M for Hunter mining land reuse

15 Jul

Queensland invests $6M to back landholders in protecting wildlife habitats

15 Jul

Channel Infrastructure advances Marsden Point biorefinery plans

15 Jul

Hydrogen future hinges on materials not production, review finds

10 Jul

Queensland invests in state-of-the-art biofuels hub in Brisbane

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required