Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov, 2026



AGL Energy Ltd. subsidiary Mount Britton Battery Pty Ltd has submitted plans to develop a major battery energy storage system near Nebo in central Queensland.

The proposed Mount Britton Battery will feature a delivery capacity of up to 500 megawatts (MW) and up to 2,000 megawatt-hours (MWh) of total usable storage.

Designed with an operational lifespan of 20 years or more, the project may be constructed in a single 500 MW phase or across two stages of up to 250 MW each.

The proposed project is now under assessment under the federal government’s Environment Protection and Biodiversity Conservation (EPBC) Act.

Key infrastructure for the development includes battery modules, inverters, transformers, grid connection equipment, control facilities, security fencing, acoustic walls, and stormwater management systems. Additional low-impact works, such as geotechnical testing and cultural heritage surveys, will precede main construction.

Situated at 3 Suttor Developmental Road within the Isaac Regional Council area, the 26.9-hectare site lies approximately six kilometres north of Nebo and 75 kilometres southwest of Mackay.

The project sits immediately east of Powerlink’s existing 275-kilovolt Nebo Substation, providing crucial access to regional transmission infrastructure.

AGL has designed the development footprint to minimise environmental impacts. The direct disturbance area is restricted to 15.6 hectares on previously cleared or non-remnant grazing land, intentionally avoiding a nearby natural watercourse.

Furthermore, an 11.3-hectare environmental avoidance area across the eastern portion of the site will be strictly preserved to protect local flora and fauna habitats and retain regional ecological connectivity.

Connection infrastructure linking the facility to the adjacent Powerlink substation will be managed as a separate scope of work by a designated transmission operator.

Once operational, the Mount Britton project will support grid stability and firm renewable energy integration across regional Queensland, aligning with broader national efforts to transition toward clean energy storage solutions.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
13 Nov

Asia-Pacific clean energy deal platform launches at COP31

13 Nov

UNSW researchers help Pacific communities to repair off-grid solar systems

12 Nov

University of Melbourne students take top prize at international floating wind challenge

12 Nov

New clean energy training facility to prepare WA’s future workforce

11 Nov

RMIT to lead new research hub to advance renewable energy and resource recovery

13 Nov

Cities outpace national governments on climate targets: new report

13 Nov

NSW sustainable cities awards celebrate Hawkesbury Council’s achievements

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

13 Nov

Australian PM’s Pacific renewables push criticised amid new fossil fuel investments

11 Nov

WA invests $15M to establish vanadium battery facility

09 Nov

Climate group urges COP31 hosts to deliver pathway away from fossil fuels

09 Nov

Western Australia achieves 62% recycling rate in 2024-25

09 Nov

Australia’s fossil fuel exports face a fast decline

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required