Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

$120 million to roll out community batteries across Australia

04 Apr, 2023
community



The Australian Renewable Energy Agency (ARENA) has announced $120 million in funding will be made available for Round 1 of the Community Batteries Funding Program.

The program aims to support the deployment of community batteries across Australia to lower energy bills, cut emissions and reduce pressure on the electricity grid.

ARENA is now seeking applications for up to $20 million funding to deploy a minimum of five community batteries.

To be eligible for ARENA funding, each community battery must be between 50 kW and 5 MW in size and connected to the distribution network.

ARENA has allocated $120 million in funding for Round 1, split equally across two streams:

  • Stream A: Distributed Network Service Providers (DNSP)
  • Stream B: Applicants that are not DNSPs

Community batteries provide energy storage in the distribution network that can store excess solar energy for later use, putting downward pressure on household electricity costs, and easing pressure on the local electricity grid.

ARENA CEO Darren Miller said community batteries represent the next step in optimising distributed energy resources in the electricity grid.

“Not everyone is able to install rooftop solar, but by storing electricity close to the point of consumer demand, we can reduce network costs and alleviate constraints in areas with high solar penetration. This will ultimately reduce electricity costs for all consumers.”

“We’re excited to be working on this initiative to support the roll out of these 342 batteries across Australia.”

As part of the 2022/23 Federal Budget, the Australian Government allocated $200 million for the Household Solar budget measure to deploy 400 community batteries across Australia.

ARENA was allocated $171 million of this funding to deliver at least 342 batteries.

ARENA has allocated $120 million to Round 1 and intends to allocate the remaining funding to a future round, based on learnings from this tranche.

The Department of Climate Change, Energy, the Environment and Water (DCCEEW) will deliver an initial 58 community batteries through the Business Grants Hub. This round is now closed, with DCCEEW now assessing applications.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
07 Oct

Origin lodges plans to expand Eraring BESS

07 Oct

Australia’s battery subsidies drives focus to usage sizing over rebate chasing

07 Oct

Neoen commences construction of 346 MW Goyder North Wind Farm

06 Oct

Australia moves to deliver Marinus Link to connect Tasmania and Victoria

05 Oct

Atmos Renewables reaches financial close on 1 GW of renewable energy projects

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

18 Sep

Bamboo breakthrough could reshape Australian construction materials

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

28 Sep

Coal exits put Australia’s grid reliability to the test

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required