Sigenergy has unveiled SigenCube, a larger all-in-one battery energy storage system for commercial and industrial sites, at All Energy Australia 2026.
SigenCube joins the company’s existing commercial range, SigenStor and SigenStack, offering more capacity per cabinet and combines power conversion, energy management and distribution in a single unit.
Sigenergy ranked number one globally for residential energy storage by MWh shipments in the first half of 2026, according to S&P Global Energy, and is Australia’s number one residential battery in SunWiz 2026, with more than 120,000 systems installed here.
Sigenergy stated that the next wave of growth in storage is commercial.
Sigenergy ANZ Managing Director Will Hall said the product targets sites where storage has struggled to gain traction.
“SigenCube is our answer for the sites where space, noise and heavy loads have held storage back,” he said.
Hall said customers want more than raw capacity.
“They want a system that fits on a tight site, runs quietly next to its neighbours and keeps the plant going when the grid does not,” he said.
Each SigenCube ES401 cabinet holds 401kWh in a 1.1m by 1.65m footprint, delivering an energy density of over 220kWh per square metre.
For a 4MWh project, the system needs 54.5 m², compared with more than 80 m² for traditional solutions, a saving of over 30 per cent.
Every cabinet has its own energy management system, and up to 100 units can run in parallel without an external data logger.
Units are pre-commissioned at the factory, and basic setup and diagnostics take three to five minutes on site through the app.
Noise has often limited where commercial batteries can be installed, however, SigenCube runs below 60dB at one metre, about the level of a normal conversation, so it can sit close to offices, commercial centres and neighbours.
The system is also built for heavy industrial loads, with a 150 per cent overload for 10 seconds carrying air compressors, conveyors and motor-driven pumps through their start-up surges without tripping.
AI thermal management uses live cell data and day-ahead load forecasts to adjust cooling, cutting auxiliary power use by up to 20 per cent.
Protection runs from the battery pack to the whole system, including a top explosion vent, smoke and heat detection, cabinet-level aerosol suppression, a water firefighting interface and multiple layers of overcurrent protection.
Grid-forming capability delivers 0ms load-side disruption and MWh-level black start without grid support, and a sealed cooling loop gives a 10-year coolant life.
SigenCube will be available in Australia for off-grid projects and in New Zealand from January 2027.



