Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

DOGO Power reveals grid-forming energy storage solution for miners

18 May, 2026
DOGO Power’s grid-forming energy storage empowers green transformation of Indonesia’s mining industry.


DOGO Power has unveiled its innovative grid-forming energy storage and green mine microgrid one-stop solution, designed to decarbonise Southeast Asia’s mining sector.

The company’s launch targets off-grid mining operations grappling with the dual challenges of energy security and strict emission reduction targets.

DOGO Power’s proprietary 4S Grid-Forming Technology integrates energy and power management, battery management, and storage conversion into a unified architecture.

Unlike traditional grid-following systems, this grid-forming technology operates independently of a main grid, autonomously supporting voltage and frequency. More importantly for remote sites, it features a rapid two-minute black start capability.

The system is engineered for harsh, high-temperature, and dusty mining environments, utilising pioneering short-blade battery cells with dual-sided liquid cooling.

This design delivers over 10,000 cycles, 30 per cent higher than the industry average, and ensures a system lifespan exceeding 15 years.

Furthermore, integrated AI through DOGO’s Cloud EMS optimises solar-storage-diesel hybrid configurations, slashing traditional design timelines for 100MW-scale projects from a month to just one week.

For Indonesian mining enterprises, the solution promises a triple-tier value upgrade across economics, safety, and sustainability.

It significantly undercuts traditional diesel generation costs, cutting expenses from up to US$0.40/kWh down to between US$0.12 and $0.16/kWh.

This represents an immediate 15 to 20 per cent reduction in electricity costs, allowing operations to achieve capital payback within three to five years.

Moving forward, the company will continue to leverage its grid-forming energy storage technology and integrated solutions, working hand-in-hand with local partners to promote green upgrading of regional mining industries and support Indonesia in achieving its energy transition objectives.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Oct

Victoria gives green light to Southern Hemisphere’s largest wind farm

16 Oct

ARENA launches Round 3 of Solar Sunshot program with solar manufacturing focus

16 Oct

WA awards major Clean Energy Link contract to local firms

15 Oct

Transmission bottlenecks risk Sweden’s clean energy expansion

14 Oct

ARENA commits to Australian solar farm robot manufacturing

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

09 Oct

AGL partners with Bega Group for large-scale rooftop solar project

07 Oct

Solar integration sets a new benchmark at Western Sydney International Airport

06 Oct

KGBS opens green building finance repository platform

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

14 Oct

Carbonxt secures expanded US supply deal, boosting FY27 outlook

13 Oct

Japanese energy giant opens $200M Queensland green hydrogen facility

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required