Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Rail operator on track to reduce resources sector emissions  

08 Mar, 2024
Rail



The Australian Renewable Energy Agency (ARENA) has announced $9.4 million in funding to a new project to electrify rail freight transport of commodities.

The grant to Aurizon Operations Limited (Aurizon) will contribute to an $18.8 million ‘Battery Powered Tender for Heavy Haul Fleet Decarbonisation’ project and is a world-first proof of concept rail tender.

The Project will develop, test and trial a battery electric tender, to power a diesel-electric locomotive in a hybrid diesel and battery configuration, working to cut emissions from Australia’s resources industry.

ARENA CEO Darren Miller said the project is addressing an emissions challenge in one of Australia’s largest industries.

“Aurizon’s battery electric tender is a world first that hopes to pave the way for the rail freight industry and help the resources on its decarbonisation journey.”

The Battery Electric Tender (BET) prototype will consist of a purpose-built wagon housing a 1.8 MWh battery. There is the potential that at scale, and with the use of regenerative braking, a BET could enable a power transition from diesel to electricity when coupled with a modified diesel electric locomotive. In addition, when coupled with future Battery Electric Locomotives, the BET will potentially provide all the power required for up to 50% of Aurizon’s commercial haul routes.

Battery electric locomotion offers a pathway to decarbonising rail freight using existing rail infrastructure, without electrifying railway lines at potentially much greater cost.

Project partner Alta Battery Technology (Alta) will design and construct the unit in Australia and it will be deployed hauling raw materials for an Aurizon customer.

The project will also see the installation of associated charging infrastructure at an Aurizon customer site. Engineering consultants will provide technical services and engineering work for the charging infrastructure connection.

Aurizon is Australia’s largest rail freight operator, with around 700 active locomotives hauling over 15,000 wagons of product across Australia.

Rail transport emissions from Australia’s heavy haul freight industry accounts for more than 4 Mt of CO2e, or 0.8% of Australia’s total greenhouse gas emissions.

The bulk of these emissions are in service of Australia’s resource industry, which relies on heavy rail freight haulage to transport commodities from remote mine sites to ports and refineries.

“The resources industry is a pillar of the Australian economy, but also accounts for a significant share of emissions,” Mr Miller said.

“ARENA is investing in the technological solutions that will enable the sector to reduce emissions across its operations.”

Project design is currently underway, with Aurizon expecting the unit to commence trial operations in early 2026.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Apr

Neoen charges ahead with new battery projects in Japan and France

08 Apr

South Australia opens massive development area for renewable energy projects

08 Apr

TotalEnergies and Masdar create renewable energy giant to power Asia

08 Apr

UV radiation may cut solar panel life by a decade, new study finds

08 Apr

Near-700 GW renewable energy surge a record for global capacity

08 Apr

New grants to boost energy efficiency in community sport

08 Apr

New GBCA program to guide sustainable data centres

23 Mar

Dexus and Woods Bagot redefine sustainable workplaces

23 Mar

Australia leads with the nation’s largest EV‑ready building

12 Mar

WorldGBC and C40 partner to decarbonise cities

09 Apr

InterContinental Energy’s P2(H2)Node tech secures ARENA funding

09 Apr

EORA Energy launches national development pipeline for vanadium batteries

09 Apr

Pacific nations convene in Vanuatu to confront fossil fuel dependency

08 Apr

Revised US oil and gas rules prompt methane safeguard concerns

08 Apr

Governments strengthen fossil fuel restrictions despite recent crises

  • Smart Energy

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • Flow Batteries

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required