Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Hydrogen project acknowledged with South Australian award

12 Dec, 2022
Hydrogen



Australian Gas Networks (AGN), part of the Australian Gas Infrastructure Group (AGIG), has won the 2022 South Australian Premier’s Community Engagement Award for the Hydrogen Park South Australia (HyP SA) project.

HyP SA began supply of up to 5 per cent blended renewable gas into the AGN existing gas network to more than 700 homes in Mitchell Park back in May 2021, where residents have embraced their status as Australia’s first recipients of renewable blended gas. By early next year, HyP SA will expand its operations to supply up to an additional 3,000 homes in nearby suburbs with a renewable gas blend.

AGIG Chief Executive Officer, Mr Craig de Laine, said: “AGIG is very proud and honoured to have been recognised for this award from the South Australia Premier Peter Malinauskas. It is a great recognition of the work our team does in engaging with the communities we serve.

“We thank the community and industry stakeholders associated with HyP SA for their support and participation of our engagement program.”

“I would also like to thank the South Australian Energy Minister Tom Koutsantonis. Hydrogen Park SA would not exist without his leadership and that of the Labor Government more broadly.”

AGIG is taking active steps to deliver renewable gas and aims to deliver at least 10 per cent renewable gas across its distribution networks by 2030, with a vision of 100 per cent renewable gas by 2040, and by no later than 2050.

AGIG plans to develop Hydrogen Park Murray Valley (HyP Murray Valley) – partnering with ENGIE – in Wodonga, Victoria. HyP Murray Valley will comprise a 10MW electrolyser using renewable electricity to produce hydrogen from 2024. Subject to approvals, the site will blend up to 10 per cent renewable hydrogen into the existing natural gas network to supply more than 40,000 residential, commercial and industrial customers in Wodonga, Victoria and nearby Albury, New South Wales.

AGIG is also developing a hydrogen plant in Gladstone, Queensland.

Related Articles

Connecting Hydrogen APAC 2025

Hydrogen Technology Conference & Expo

Hydrogen Technology Conference & Expo

Wood Mackenzie Hydrogen Conference

Wood Mackenzie Hydrogen Conference

Wood Mackenzie Hydrogen Conference 2024

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Jul

Federal government funds green iron project in Kwinana

09 Jul

US battery storage market growth defies uncertainty

09 Jul

RISE Accelerator applications have now closed

09 Jul

Sanderson unveils guideline supporting community benefits

03 Jul

Governments double solar battery incentives in NSW

10 Jul

FWPA launches national recycled timber standard

10 Jul

WorldGBC urges stronger building climate policies

25 Jun

Cool project reduces car park surface temperatures

25 Jun

Ocean Reef Marina achieves top sustainability certification

18 Jun

McNab wins Queensland Sustainability Award 2025

10 Jul

AI adoption accelerates the discovery of green ammonia

03 Jul

Pilbara aims to lead clean shipping as a green fuel bunkering hub

03 Jul

Denison Gas pioneers Australia’s energy storage transformation

25 Jun

Japanese scientists create plastic dissolving in seawater

25 Jun

Australia opens largest renewable hydrogen refuelling station

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required