Follow us:
Subscribe to our newsletter

logo

  • Energy
  • Construction
  • Resources
  • Projects
  • Products and Services
  • Events
  • Online Magazine
  • Advertise
  • Contact
Home
  • Energy
  • Construction
  • Resources
  • Projects
  • Products
  • Events
  • Online Magazine
  • Advertise
  • Contact

AGL secures ARENA funding for large scale EV trial

18 Nov, 2020
14


The Australian Renewable Energy Agency (ARENA) has just announced $2.9 million for AGL Energy Services to undertake a large scale electric vehicle (EV) charging trial across New South Wales, Queensland, Victoria and South Australia.

As part of the $8.25 million trial, AGL will recruit 300 EV owners to demonstrate a range of smart and managed charging solutions including:

  • 200 smart chargers will be installed at EV owners’ homes where they will be remotely monitored and controlled to help move charging to off-peak times when cheap renewable energy is available or to respond to constraints on the grid.
  • A software-based smart charging trial involving 50 EVs to test the ability of EV charging to be controlled by communicating directly with the car without the need for separate smart-charging hardware.
  • 50 EVs will participate in a vehicle to grid (V2G) trial to assess the ability and commerciality of EVs to become a source of energy storage and provide energy back to the grid when required.

 

AGL is contributing $5.3 million towards the trial which also involves project partners JET Charge, Chargefox and FlexCharging and a cohort of distribution networks.

ARENA’s funding will support charging hardware costs, installation costs and software development.

The project will be the first time V2G EVs will be deployed in a residential context in Australia. It will also be the first time smart charging has been deployed in Australia via software, potentially removing the need for additional smart charging hardware in the future.

The mix of alternative charging types has been selected by AGL on the basis of current technology readiness, with smart chargers being the most mature technology and the main focus, while V2G and software-based smart charging are less mature but offer considerable potential for the future.

AGL aims to accelerate the commercialisation of the orchestration of EV charging by examining the key sources of uncertainty and investment risk such as the commercial model, technology approaches, customer behaviour and market structure.

The trial will also help to inform electricity retailers, customers and DNSPs of the potential for EV charge management and how those benefits can be recognised and valued. The project will provide detailed insights into customer behaviour to inform how best to maximise customer participation and value for the customer.

ARENA CEO, Darren Miller, said these trials would allow EVs to benefit the wider electricity system, and would support the integration of EVs into the system as uptake increases.

“As more Australians switch to EVs, it will be important to manage and orchestrate EV charging to avoid potentially costly impacts on peak demand, associated network charges and grid security issues,” Mr Miller said.

“EVs also provide economic opportunities for consumers through the potential of reduced electricity costs through higher network utilisation and the potential to generate revenues that would reduce the cost of car ownership.”

“We hope trials like this will provide valuable insights into how EVs can provide value for money for consumers, but also help to transition our electricity network going forward.”

AGL General Manager Decentralised Energy Resources, Dominique Van Den Berg, said AGL was excited to partner with ARENA to understand when and how customers charged their EVs, which will become a larger part of the energy market as their take-up increased.

Ms Van Den Berg said the trial would be the first time in Australia that people could use their EVs to power their houses and export excess energy to the grid.

“This trial will demonstrate how we create value using customers’ distributed energy assets like batteries and share the value with them,” she said.

“We’ll be talking to customers during the trial to understand how they feel about smart charging so we can improve their experience.”

“Although the trial is limited to 300 customers, it will help us to shape future energy offers to EV owners.”

ARENA has previously supported the rollout of two fast-charging EV networks across Australia by Chargefox and Evie Networks.

This year, ARENA also supported Origin and ActewAGL to trial different technologies and approaches to accelerate the commercialisation of managed EV charging and V2G services respectively.

Related Articles

Metro and CEFC shoot for the stars with new greener homes

Metro and CEFC shoot for the stars with new greener homes

Two solar farms and a battery could help power Nickel West mines

Decmil awarded contract for Crookwell 3 Wind Farm

Decmil awarded contract for Crookwell 3 Wind Farm

Aquatic centre to be powered by renewable energy

Aquatic centre to be powered by renewable energy

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Latest Posts

  • Energy
  • Construction
  • Resources
19 May

New trial to see how EVs can help stabilise power grids

16 May

Green hydrogen critical to decarbonisation but remains a challenging investment

12 Apr

Rooftop solar PV curtailment raises fairness concerns

07 Apr

New roadmap paves the way for decarbonised precincts

06 Apr

Queensland building reforms to back solar, transparency and safety

29 Apr

AGL and Nu-Rock sign MoU to investigate feasibility of repurposing coal ash

15 Feb

Innovative supercooling building materials help moderate temperature

04 Feb

New government incentive for low carbon timber

24 Nov

Building sustainability initiatives gather pace in Australia

12 Nov

Urban Sequoia concept allows buildings to absorb carbon

21 Apr

New report outlines pathway to 100 per cent renewable Australian gas

24 Mar

Coffee grounds and hydrogen from waste among new Green Steel breakthroughs

24 Mar

QLD government makes major investment in Wambo wind farm

23 Mar

Renewable hydrogen plant to fuel heavy transport in QLD

23 Mar

AGL and ARENA begin smart charging homes

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to our newsletter

Our Other Titles

  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2022 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required