Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

WA completes second Kwinana big battery, breaks renewable energy records

10 Dec, 2024
WA completes second Kwinana big battery, breaks renewable energy records



The Western Australian government’s clean energy initiative has reached a significant milestone with the completion of the second Kwinana big battery, coinciding with the state breaking renewable energy records in November.

The $661 million Kwinana Battery Energy Storage System stage two, which began construction in July 2023, is now complete and set to be operational before Christmas.

The project, supporting approximately 200 construction jobs, features 288 shipping container-sized battery modules and 72 inverter units, boasting 800 megawatt-hours of storage and 200 megawatts of capacity.

This development comes as Western Australia’s main electricity grid, the South West Interconnected System, achieved a new renewable energy record on November 17, with renewables peaking at 85.1 per cent of energy production.

Since 2017, the WA state government has more than doubled the renewable energy contribution to the grid, increasing from 14 per cent to over 34 per cent in 2023.

This investment in battery systems is expected to further boost renewable energy usage, including rooftop solar, while ensuring affordable and reliable energy for the state.

Once operational, Synergy’s two big batteries in Kwinana will have the capacity to power 450,000 households for up to four hours throughout Perth and beyond.

These batteries complement other significant energy storage projects in the state, including Neoen’s 560MW/2,240MWh battery unit in Collie and the upcoming Collie Battery Energy Storage System.

Premier Roger Cook highlighted the importance of this project, stating: “Our clean energy plan is setting up WA for the future and locking in affordable and reliable energy for every Western Australian.

“We’re smashing renewable energy records because of our Labor government’s significant investment into the energy transition.”

Energy Minister Reece Whitby added: “With the completion of Synergy‘s second Kwinana battery, we are delivering on our promise to provide Western Australians with power that is clean, affordable, and reliable.

“It won’t just soak up excess rooftop solar and onshore wind during the day — it will provide electricity in the evening, when the sun doesn’t shine, and the wind doesn’t blow.”

The state government is investing more than $5.4 billion in Western Australia’s energy transition, aiming to phase out coal by 2030 while maintaining a reliable and stable energy system.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Connecting Hydrogen APAC 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
17 Aug

Energy firms explore mines for long-duration grid storage

17 Aug

BW ESS acquires Yanco energy storage system in New South Wales

14 Aug

Researchers nears solution to solar panel waste problem

13 Aug

Australia’s green fund commits $105B in clean energy projects  

13 Aug

Cheaper silver recovery could end solar panel landfill dumping

12 Aug

U.S. Green Building Council appoints David Purcell as CMO

05 Aug

NSW backs large-scale hemp manufacturing for housing with $2m grant

31 Jul

Closure of NSW lighting scheme creates gap for warehouses and industrial sites

29 Jul

Stockland launches first net-zero energy village Ampére

28 Jul

NSW expands Greener Neighbourhoods Grants to combat urban heat

14 Aug

Australian Vanadium, Alcoa partner to explore vanadium battery system for WA refineries

05 Aug

KETH project nears operation after award of EPC contract

05 Aug

Mining sector performance proves renewables work at scale

03 Aug

Investors favour flexible biopower over simple generation projects

29 Jul

Researchers find microbes turn mining waste into mobile nanoparticles

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required