Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Synergy completes battery installation at Kwinana Stage Two

13 Jan, 2024
Synergy completes battery installation at Kwinana Stage Two



Synergy has installed the necessary containerised battery systems at Kwinana Battery Stage Two — which will be WA’s biggest grid-connected battery energy storage system, providing 200 megawatts of power with 800MW hours of energy storage.

This milestone marks a major step in expanding the WA government’s battery portfolio, as it will allow for cleaner, reliable and affordable energy for the state.

Once complete, the new battery system will power 370,000 average homes in WA for approximately four hours.

Kwinana Battery Stage Two has already created more than 160 jobs during its current construction phase and is due to be complete in late 2024.

The state government is investing more than $3 billion towards renewable energy generation, transmission and storage as part of its commitment to the energy transition.

That investment includes supporting Synergy to expand its portfolio of battery assets to 3000MWh of storage capacity by the end of 2025.

WA Premier Roger Cook stated, “These large-scale batteries allow us to pump more renewable energy into the grid while keeping our system stable — and it’s great to see this transition happen right in the heart of the Kwinana industrial strip.”

Installation of the Kwinana batteries comes as Synergy gears up to begin works early this year in Collie on one of Australia’s biggest lithium-based batteries.

Once built, that battery will provide 500MW of power with 2000MWh of energy storage.

Large-scale battery storage helps to provide system stability and supports the continued uptake of renewable electricity generation in the South West Interconnected System (SWIS).

Newly installed battery systems at Kwinana Battery Stage Two were supplied by Contemporary Amperex Technology Co. Limited (CATL).

Power Electronics has been contracted to provide 72 inverters.

WA Energy Minister said: “Renewables uptake is surging in WA with the SWIS at times powered by more than 80 per cent renewables.

“Through a major expansion of battery storage in WA, the Cook Government is ensuring the security and reliability of the state’s energy system.”

Related Articles

WOMEN IN ENERGY 2025

Women in Energy & Renewables Summit 2025

Asia-Pacific Hydrogen Summit & Exhibition 2025

Enlit Asia 2025

International Energy Week (IEW) 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
19 Jun

TotalEnergies acquires major UK renewable portfolio

17 Jun

Renewables surge, with solar and wind dominating

17 Jun

UNSW engineers accelerate green tech commercialisation

09 Jun

AEMO’s distribution focus enables community participation

06 Jun

Report shows 20 million gained energy access in 2024

18 Jun

McNab wins Queensland Sustainability Award 2025

18 Jun

Investa signs six-year renewable energy agreement

12 Jun

Cumberland celebrates planting its 1,000th tree

10 Jun

Stantec helps New Epping achieve sustainability excellence

09 Jun

RMIT engineers transform low-grade clay into cement

09 Jun

Australia’s hydrogen certification framework faces scrutiny

09 Jun

Biofuel demand outpaces supply, risking shortages

28 May

Major contract awarded for methanol facility in UAE

27 May

Archaeologist accuses WA government of North West Shelf cover-up

13 May

Queensland resources sector drives energy transition

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required