Subscribe to Newsletter
  • ACQUIRE
  • JAPAN ENERGY SUMMIT

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Construction starts on two renewable energy projects in SA

12 Oct, 2020



Construction has officially commenced on two major renewable energy projects in South Australia.

Renewable energy development company, DP Energy, and Spanish energy giant, Iberdrola, are spending $500 million on a hybrid wind and solar plant at Port Augusta Renewable Energy Park in South Australia, while Singapore-based Nexif Energy has already begun the $170 million stage two expansion of its Lincoln Gap Wind Farm, also near Port Augusta.

The Port Augusta Renewable Energy Park project will consist of 210 megawatts (MW) of wind generation from 50 turbines and 110 MW of solar PV generation from 245,000 solar panels.

The Lincoln Gap Wind Farm will ultimately consist of 464MW of wind turbines.

The 126MW first stage of the project, featuring 35 turbines, achieved full commercial operation in May while the 86MW second stage will include 24 turbines. The project also includes a 10MW grid-scale battery storage. A construction timeline for a further 252MW is still being developed.

South Australia leads Australia in the uptake of wind energy and roof-top solar with renewable sources accounting for more than 70 per cent of the electricity generated in the state.

On Friday, Premier of South Australia, Steven Marshall, turned the sod on the two projects, worth a combined $670 million.

“During the construction phase of the DP Energy and Iberdrola project, there will be 200 full-time construction jobs and 20 full-time ongoing jobs once the project is complete,” Mr Marshall said.

“Nexif’s expansion will generate 110 jobs during the construction phase and 10 ongoing jobs once operational.”

“These projects provide a critical boost to South Australia’s post-COVID economic recovery, and are encouraged by the SA-NSW interconnector which provides them with new export opportunities,” he commented.

South Australian Minister for Energy and Mining Dan van Holst Pellekaan commented that the mix of wind and solar at DP and Iberdrola’s project would showcase a new generation of renewables designed to provide predictable power more uniformly across the day.

“The project’s combined solar and wind generation output is expected to closely match South Australia’s electricity demand profile which will help place downwards pressure on electricity prices while also assisting with the security and reliability of the grid,” he said.

Meanwhile, construction of the 280MW Cultana Solar at nearby Whyalla is expected to begin in the coming months.

The project, on a 1100 hectare site north of Whyalla on Eyre Peninsula, is the first large scale project in billionaire industrialist Sanjeev Gupta’s plan to generate one gigawatt of dispatchable renewable energy in South Australia.

The state is also home to the world’s largest lithium-ion battery (100MW/129MWh), which was established in late 2017 at Neoen’s Hornsdale Wind Farm in the state’s Mid-North.

Related Articles

Hydrogen Technology Conference & Expo

Hydrogen Technology Conference & Expo

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Windpower, Data and Digital Innovation Forum

Windpower, Data and Digital Innovation Forum

Floating Wind - Europe

Floating Wind – Europe

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 May

Snowy 2.0 workers strike over pay disparity

16 May

Long-duration batteries key to renewable reliability

16 May

Rural not-for-profits drive clean energy in regional Australia

13 May

NSW unveils 10 Central-West Orana renewables projects

13 May

Australia’s grid hits record 43 per cent renewables in 2025

13 May

ResiLoop drives Melbourne flooring waste recycling revolution

13 May

Melbourne housing growth exposes environmental crisis

08 May

NABERS SPI 2025 launches milestone

29 Apr

Salta achieves first 5-Star Green Star industrial milestone

28 Apr

GCCA launches world’s first low carbon ratings system

13 May

Queensland resources sector drives energy transition

08 May

Global energy mix shifts slowly toward fuel alternatives

08 May

Clean energy mineral rush fuels rights abuses

29 Apr

Mitsui invests $1b in US low-carbon ammonia project

24 Apr

Collie’s industrial transformation accelerates with major project milestones

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required