Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

INPEX reaches major renewable energy milestone in Australia

19 Jun, 2024
INPEX reaches major renewable energy milestone in Australia



INPEX Corporation has announced a significant step forward in its renewable energy initiatives with the final investment decision (FID) for the Quorn Park Hybrid Project in New South Wales, Australia.

The Quorn Park Hybrid Project, a joint venture with Enel Green Power Australia Pty Ltd (EGPA) in which INPEX holds a 50 per cent stake, will combine a 98 MWdc (80 MWac) photovoltaic solar farm with a 20 MW/40MWh battery energy storage system connected to the grid.

The Quorn Park FID marks INPEX’s first renewable energy investment decision in Australia since acquiring a 50 per cent stake in EGPA from Enel Green Power S.p.A. in September 2023.

EGPA operates hybrid renewable projects across Australia combining solar, wind, and battery storage.

As an active manager of EGPA’s portfolio, INPEX aims to enhance the company’s output capacity and support its innovative solutions in retail, trading, and beyond.

Once operational, the Quorn Park Hybrid Project will showcase an advanced model for integrating renewable generation and storage to stabilise grid performance. By efficiently charging and dispatching solar power through its battery system, the project can regulate electricity flows to the grid.

This hybrid approach represents a significant step in Australia’s transition to clean energy sources while ensuring reliable power delivery.

INPEX remains committed to transforming the energy landscape and achieving net zero carbon emissions by 2050 through strategic investments in renewable technologies worldwide.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
07 Oct

Origin lodges plans to expand Eraring BESS

07 Oct

Australia’s battery subsidies drives focus to usage sizing over rebate chasing

07 Oct

Neoen commences construction of 346 MW Goyder North Wind Farm

06 Oct

Australia moves to deliver Marinus Link to connect Tasmania and Victoria

05 Oct

Atmos Renewables reaches financial close on 1 GW of renewable energy projects

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

18 Sep

Bamboo breakthrough could reshape Australian construction materials

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

28 Sep

Coal exits put Australia’s grid reliability to the test

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required