Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Improvements in PV recycling are necessary to meet future demand

13 Oct, 2022
PV module waste generated by a typhoon in South Korea in 2018. Image supplied.


With rapid PV deployment around the world, comes corresponding PV waste; but are countries prepared and what regulatory and technological approaches should each country integrate?

A new report from the IEA PV Power Systems programme investigates PV end-of-life (EOL) practices and has found that further improvements in PV EOL processes are required to meet future demand and to realise high-value, low-cost recycling.

Additionally, regulatory, and technological approaches need to be well integrated and adapted to the conditions of each country or region.

Find the full IEA PVPS report here.

Australian co-author of the report, Dr Rong Deng says, “Australia is expected to have more than 10,000 tons of waste solar panels by the mid-2020s mainly coming from replacement of residential PV systems and the volume will surge after 2030.

“Local waste recycling industries and governments have started taking collaborative and technology-driven approaches to deal with it sustainably.”

Currently, there are no recycling or product stewardship requirements for PV modules, inverters, and batteries in any state or territory in Australia; however, PV systems are a “listed class of products” to consider under the Product Stewardship Act.

An activity to evaluate the inclusion of PV systems in the national stewardship program was led by Sustainability Victoria, a statutory authority with a board appointed by the Minister for Energy, Environment and Climate Change.

The findings published in 2019 show that either voluntary or co-regulatory approaches for PV modules might be feasible in Australia and are likely to achieve the environmental, health, and safety objectives of the Product Stewardship Act, improving the management of EOL PV modules and opportunities to reuse valuable materials.

More recently, the Product Stewardship Centre of Excellence led 6 meetings with the Industry Working Group from January to March 2022 on the co-design of a product stewardship scheme for PV systems.

The outcomes from these meetings, recognising that stronger government intervention will be beneficial, have been submitted to the Department.

Elsewhere, all producers with PV modules in the EU market are required to either operate their own take-back and recycling scheme or to join what are known as producer compliance schemes.

In South Korea, the Extended Producer Responsibility (EPR) regulations will be enforced in 2023. In the United States, regulations specific to PV waste exist in some states.

Even in Japan and China, where there are no compulsory PV-specific regulations at this time, several discussions, and activities for supporting PV EOL have been carried out.

In the coming decades, PV waste will increase faster than anticipated. The total amount of PV module waste internationally is still small, but the current situation is not suitable to deploy PV module recycling in the long term.

To meet and optimise the end-of-life management of PV waste, regulatory and technological approaches should be well integrated, and their potential options should be adapted to the conditions of each country or region.

With this in mind, the 3rd Australia PV End-of-Life Management and Sustainability Workshop will be run as a parallel session during Asia Pacific Solar Research Conference (APSRC) in Newcastle from 29 Nov – 1 December in the Renewable Deployment and Integration stream.

The two-hour session will cover the latest updates from local industry, product stewardship, and researchers and includes the following presentations:

  1. Solar panel waste projection in Australia, 2022-2035
  2. Esha Thapar: Evaluating the Feasibility and Environmental Impacts of End-of-Life Management Strategies for Photovoltaic Modules
  3. Sustainability at 5B and the circularity of the 5B MAVERICK
  4. End-of-life PV collection and recycling in NSW by PVIndustries
  5. Scipher advanced solar panel recycling
  6. Updates on national product stewardship scheme design for solar panels, batteries, and inverters.

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Jun

AEMO’s distribution focus enables community participation

06 Jun

Report shows 20 million gained energy access in 2024

06 Jun

Kulak Solar Village is Iraq’s first off-grid community

06 Jun

5B receives $46 million to expand manufacturing

06 Jun

EnergyAustralia admits offsets do not undo harm

12 Jun

Cumberland celebrates planting its 1,000th tree

10 Jun

Stantec helps New Epping achieve sustainability excellence

09 Jun

RMIT engineers transform low-grade clay into cement

09 Jun

Perth’s urban tree canopy saw slight increase in 2024

30 May

Green homes now mainstream Australian property priority

09 Jun

Australia’s hydrogen certification framework faces scrutiny

09 Jun

Biofuel demand outpaces supply, risking shortages

28 May

Major contract awarded for methanol facility in UAE

27 May

Archaeologist accuses WA government of North West Shelf cover-up

13 May

Queensland resources sector drives energy transition

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required