Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Graphite Energy’s $29 million sustainable energy project approved

18 Sep, 2023
Graphite Energy’s $29 million sustainable energy project approved
Image courtesy Graphite Energy


Graphite Energy has received development approval to develop its Lake Cargelligo facility in New South Wales, with construction to commence in late 2023, marking the first stage of the company’s Lake Sustainable Energy Precinct masterplan.

The new Lake Cargelligo facility will extend Graphite Energy’s current site to house a new manufacturing research facility, which will play a vital role in the testing and design of systems that will deliver the Lake Sustainable Energy Precinct.

Upon completion, the Lake Sustainable Energy Precinct will generate renewable energy to power sustainable agriculture and create a robust circular economy, serving as an Australian-first pilot model that can be scaled and replicated throughout Australia and the rest of the world.

The ground-breaking $29 million Lake Sustainable Energy Precinct is a collaborative effort between Graphite Energy and Cygnus Ag, as well as other key stakeholders from industry, research and government.

The project aims to demonstrate how renewable energy and agriculture can coexist, using industry advancements to enable renewable energy sources without forgoing farmland.

The Lake Sustainable Energy Precinct masterplan will include a 5MW solar photovoltaic (PV) field combined with multiple forms of integrated energy storage, including:

  • battery energy storage for providing electricity
  • thermal energy storage for providing heating, cooling and drying
  • hydrogen energy storage for providing electricity and diesel fuel substitution

The energy will then be used to power sustainable agriculture operations, which will include:

  • agrivoltaics – protected cropping operation underneath and between the solar panels
  • greenhouse – protected cropping for the production of vegetables and leafy greens
  • fish farm – tank-based aquaculture system to produce fresh fish

Once fully operational, it’s estimated that the Lake Sustainable Energy Precinct will avoid over 250,000 tCO2-e in carbon emissions over its lifetime, serving as the poster project for how new technology can be leveraged to deliver viable green energy alternatives.

The surplus energy generated by the Lake Sustainable Energy Precinct will be exported to the grid and the waste streams generated from the agricultural operations will be recycled to create compost and fertiliser.

Graphite Energy Chief Executive Officer, Peter Lemmich, said the approved Lake Sustainable Energy Precinct represents a significant step forward for energy independence and a cleaner, greener future.

“As well as playing an instrumental role in supporting local agriculture in Lake Cargelligo, the Lake Sustainable Energy precinct will pioneer a pathway for the decarbonisation of agriculture more broadly, which will be a difficult to abate sector of the economy. We hope this will become a model that can be replicated elsewhere as we transition to a lower carbon economy,” said Mr Lemmich.

The creation of new renewable energy and sustainable agricultural operations will support the local economy by increasing employment opportunities.

It’s estimated up to 30 new jobs will be created once the precinct is fully operational, in addition to 100 jobs through the various stages of the construction process.

Construction of the first stage is set to be completed by July 2024.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Horizons Clean Energy Expansion Week 2026

Horizons Clean Energy Expansion Week 2026

All Energy Australia

All Energy Australia

smart energy south australia

Smart Energy South Australia

Energy Storage Summit Asia 2026

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
23 Oct

Kimberley Communities Solar Saver delivers more than $240,000 in energy savings

21 Oct

Global battery emissions could double by 2050

19 Oct

Hazelwood battery expansion to support Gippsland clean energy transition

19 Oct

Atmos Renewables expands clean energy portfolio with BayWa r.e. projects 

16 Oct

Victoria gives green light to Southern Hemisphere’s largest wind farm

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

21 Oct

Australian Passivhaus certifications quadruple in four years

21 Oct

NSW finalists announced for Sustainable Cities Awards 2026

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

23 Oct

NeoSmelt, HILT CRC to advance Australian lower-emissions ironmaking

22 Oct

ARENA backs Australia’s largest thermal energy storage project at Rio Tinto alumina refinery

20 Oct

World’s first commercial ship-to-ship green ammonia refuelling completed in China

19 Oct

Australia approves West Peron Formation for Bonaparte carbon storage project

14 Oct

Carbonxt secures expanded US supply deal, boosting FY27 outlook

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required