Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

The first net-zero-energy mass timber civic building in the U.S.

22 Jun, 2022
civic building
Image courtesy of SOM.


Located in Silicon Valley, the new San Mateo County headquarters will be the first net-zero-energy civic building constructed with mass timber in the U.S. Achieving an 85 per cent reduction in structural embodied carbon, this flexible workplace sets a benchmark for civic architecture.

With its structural design that uses cross-laminated timber to reduce embodied carbon, County Office Building 3 (COB3) will stand as a testament to San Mateo County’s environmental stewardship.

The design by SOM invites foot traffic from the neighbouring downtown district along tree-lined walkways and into the building’s plazas and cafe. COB3 is configured in an H-shape that allows for two generous plazas which face, respectively, toward the city’s commercial centre and toward the heart of the County Campus.

Timber wraps the lobby interior, and wood slatting continues as a motif throughout the building, echoing the exposed wood structural frame. The abundance of natural wood creates a soothing, visibly low-carbon environment. All occupants will benefit from biophilic design strategies—the use of natural materials, natural ventilation, and views of the surrounding landscape. While the floorplate maximises daylight throughout the interiors, the bridging floors, between the two wings of the building, create social collaboration hubs.

Every decision in construction detailing and structural design was motivated by the goal of diminishing the building’s carbon footprint. Leveraging craftsmanship, engineering knowledge, and insight from the firm’s research on mass timber construction, SOM lowered the volume of timber in the building, reduced the piece count, and pared down the number of steel components. While a typical mass timber structure has 65 to 75 per cent less embodied carbon than a conventional steel structure, COB3’s structural timber design lowered its structural embodied carbon by 85 per cent.

Further embodied carbon reduction was possible through the elimination of materials–such as conventional hung acoustical ceilings, which were replaced by alternative acoustical solutions–and the specification of low carbon materials. Carbon associated with construction activity was also reduced by simplifying field connections. The prefabricated timber components make the construction process faster and more precise than conventional building processes.

Strategies for net-zero energy

Targeting LEED Platinum certification, COB3 will be the one of the first net-zero energy, ultra-low-carbon civic buildings in the United States. Solar arrays on site will produce the energy needed for the building’s operations. Passive design strategies reduce the building’s energy use. The glass enclosures on the building’s north and south facades are recessed and shaded, while, on the east and west sides, a series of fins protect the windows. These measures minimise heat gain, reduce the need for artificial cooling, and optimise daylighting. Rather than diverting stormwater runoff to municipal treatment facilities, onsite bioretention planters will absorb and treat 100 percent of the site’s runoff. These solutions reduce environmental impact throughout the building’s life.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Feb

Iberdrola completes battery storage project in Sydney

09 Feb

Australia launches inquiry into solar recycling

09 Feb

Warradarge expansion powers WA’s renewable transformation

06 Feb

Energy Vault’s NSW BESS project lands long-term service agreement

06 Feb

NSW government fast-tracks two hydro energy projects

09 Feb

NSW government showcases net zero home to help lower energy bills

06 Feb

Construction industry pushes for freight and carbon efficiency

04 Feb

River Capital, CEFC invest in Tiwi Islands Plantation carbon project

30 Jan

VEU accreditation revoked for Save Energy Solutions following breach

29 Jan

Research shows support for office repurposing, but awareness gaps persist

10 Feb

Miner adds a little zest to its environmental zing

10 Feb

Australia and Japan forge graphite supply partnership

06 Feb

Australia’s mining diesel emissions keep rising

05 Feb

Australian Renewable Energy Hub lands AU$21 million ARENA funding

05 Feb

Australian government unveils details of Net Zero Fund

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required