Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Future Property Group building the future’s sustainable communities today

22 May, 2026
Future Property Group building the future’s sustainable communities today
David Cummins, Founder and Managing Director of Future Property Group


Future Property Group is a values‑driven developer creating innovative green designs for houses, backed by extensive research and guided by world‑class expertise.

Future Property’s pioneering EcoHome solution is designed to minimise energy consumption and maximise comfort, resilience, and sustainability. The EcoHome embodies nature-positive design, a regenerative approach to building that restores ecological systems rather than simply reducing carbon impacts.

This enables the development of buildings that work in harmony with nature, enabling a broad range of interconnected benefits to human wellbeing and the environment.

The EcoHome’s features include high-performance insulation, energy-efficient windows and doors, renewable energy sources, smart heating and cooling, efficient lighting and appliances, sustainable materials, water conservation, passive solar design, and bio-solar roofs.

Along with regeneration, the key principles of nature-positive design are to think in systems, apply nature-based solutions, and measure outcomes.

The EcoHome is also shaped by the Living Building Challenge, the world’s most rigorous performance standard for regenerative design and sustainable buildings.

David Cummins, Founder and Managing Director of Future Property Group, told Green Review that construction accounts for approximately 40 per cent of global carbon emissions and a third of the world’s waste – a scale of impact he says creates a significant research and development opportunity.

He explained: “It’s absolutely imperative that we follow new innovations, technologies, and research, as it’s actually a gold mine of untapped resources – research is how we’ll help reduce the property sector’s carbon footprint.

“Australia is quite behind the times from a regulatory and governance point of view, so we took that on board ourselves as a leader in the sustainability space and the private sector.

“Most developers will have a time-cost-quality hierarchy of their project requirements – we have sustainability, quality, cost, then time.”

Cummins said that with extra time spent planning, projects could be de-risked from user, construction, and development perspectives. He added: “Our EcoHome uses modern methods of construction, a hybrid of traditional and prefab builds.

“Most traditional homes take 15 to 20 years to achieve operational payback, and prefab homes typically take 20 to 25 years. We’re anticipating a payback of under five years for our EcoHome, which we believe is a world first.”

A standout feature of Future Property’s EcoHome is its integration of bio-solar roofs, which combine the efficiency of solar technology with the power of green roofs, demonstrating how modern design can work with – not against – the environment.

A 90-square-metre prototype of the EcoHome is anticipated to be complete in October 2026 at Gawler Caravan Park in South Australia to undertake two

12-month studies: one to support accreditation under the Living Building Challenge, and another to develop global recommendations for nature-positive design.

Cummins said the company was guided by its values – lead with positive energy, plan with precision, act with purpose, be guided by research, create in harmony with nature, and build with integrity – in its vision to develop living, breathing homes.

Cummins said: “We place a high value on research, and it’s embedded in our strategy so that every development is studied. It tells us exactly what we got right and what we got wrong — that’s how we learn.

“That way we can ensure the full carbon footprint of a building is accounted for, while protecting the environment and empowering communities now and into the future.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required