Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Fox ESS launches AirGate backup for Australian market

07 Sep, 2026



Fox ESS has launched AirGate in Australia, a compact 5-in-1 whole-home backup solution designed to simplify installation, reduce wiring and commissioning complexity, and help cut costs for Australian households.

AirGate has been developed by Fox ESS engineers drawing on proven experience from international markets, where reliable backup is essential, alongside insights gained from Australian installers supporting increasingly complex home energy systems.

With Australia surpassing 500,000 home battery installations since the Cheaper Home Battery Program began, demand for reliable, value-driven backup is growing.

Yet installation can still be complex for installers, who often face more wiring and components than necessary, increasing labour time and cost; time-consuming configuration during commissioning; switchboard space constraints, especially in compact environments; and difficulty achieving straightforward, whole-home backup without added complexity.

AirGate is designed specifically to reduce those friction points, delivering a cleaner installation path and better overall value for homeowners.

Stronger whole-home backup

AirGate provides whole-home backup of up to 63A, supporting up to 14.5 kW for single-phase systems or 43.5 kW for three-phase systems. Its compact DIN-rail design uses four poles for single-phase and six poles for three-phase installations, helping streamline switchboard planning.

Less wiring, easier installation

AirGate integrates five essential functions into a single compact unit: MCB, changeover switch, metering, bypass switch and CT.

By reducing the number of components and simplifying the system layout, AirGate can support at least 50 per cent less wiring, which helps reduce installation costs.

Based on feedback shared by Australian installers, reducing wiring for whole-home backup can save customers up to $3,000 in installation costs, depending on the distance between the inverter and the switchboard.

Smarter commissioning and operations

AirGate includes integrated 6-CT self-adaptive metering with AI Phase Self-Adaptation, designed to help identify electrical connection status and reduce manual configuration during installation and commissioning.

In addition, an optional wireless gateway will be available soon, helping make system commissioning simpler and reducing the need for communication wiring.

“AirGate is the result of listening to the market and addressing the challenges installers and homeowners experience every day,” said Leo Ye, Product & Services Director, Fox ESS Australia.

“We wanted to move beyond simply adding more technology and instead deliver a solution that makes energy systems genuinely simpler.”

The launch comes at a time when Australian homeowners are increasingly turning to battery storage to manage rising energy costs and improve resilience against outages.

As adoption accelerates under government incentive programs, solutions like AirGate aim to address a key bottleneck in the industry: the practical, on-the-ground challenges installers face when deploying whole-home backup systems at scale.

By consolidating multiple components into a single unit and cutting wiring requirements significantly, Fox ESS is positioning AirGate as a way to make backup power more accessible and affordable, without compromising on capacity or reliability.

For an industry balancing rapid growth with the need for efficient, cost-effective installation practices, the product reflects a broader shift toward simplifying complex energy infrastructure for everyday households.

Fox ESS said the release reflects its ongoing commitment to supporting the Australian market with solutions built around real-world feedback from the installers and customers who use its products every day.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 Nov

Regulator suspends South Australian solar installer over subpar work

20 Nov

Edify files Queensland solar and battery project for EPBC approval

20 Nov

Australia’s wind and battery build-out hits record level as states move towards 2030 targets

19 Nov

Norway’s ‘green battery’ status threatened by narrowing power surplus, report warns

17 Nov

Frontier Energy breaks ground on Waroona solar and battery project in WA

20 Nov

New research shows sea salt holds key to safer household hydrogen appliances

18 Nov

CCAA outlines roadmap to accelerate low-carbon concrete

17 Nov

WA invests in Cockburn Sound seagrass restoration ahead of new container port

13 Nov

Cities outpace national governments on climate targets: new report

13 Nov

NSW sustainable cities awards celebrate Hawkesbury Council’s achievements

20 Nov

WA Parliamentary inquiry urges green iron priority as trading partners move to net zero

20 Nov

Advocates call for climate levy as Australia ranks as third-largest carbon exporter

19 Nov

Australia challenged over coal and gas expansion at COP31

19 Nov

Australia and South Korea sign bilateral decarbonisation pathway

17 Nov

Asahi Kasei, Circularise, and Furuya Metal launch precious metals traceability trial

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required