Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Why the lowest-carbon material may not have the lowest impact over a building’s life

11 Nov, 2026
Evelyn Long, Renovated



Specifiers focus extensively on up-front embodied carbon as the race to net zero accelerates.

However, a 50-year view brings operational resilience, service life and replacement frequency into the calculation.

How materials withstand heat, weather and wear shapes their lasting impact, giving you good reason to look beyond the lowest-carbon option when weighing up a building’s sustainability.

Understanding your building’s whole-of-life carbon footprint

The built environment directly accounts for nearly one third of Australia’s total emissions, according to Infrastructure Australia. Up-front embodied carbon covers material production and construction.

Use-stage embodied emissions arise from maintenance, repairs and replacements, while operational carbon comes from running the building. The material’s installation-day figure forms part of an evolving whole-of-life total.

According to a survey by the Climate Group and Ramboll, 45 per cent of companies are willing to pay a premium for steel that achieves 25 per cent or more in emissions reductions. This demonstrates a significant market shift, but it also presents costs as a potential barrier to adoption.

All material choices involve trade-offs. Daniel Wright, Director and Business Development Manager at Australian Sustainable Hardwoods, the country’s largest hardwood timber manufacturer, explains that replacing concrete and steel framing with timber can cut “several hundred tonnes of CO2 upfront.”

He also flags contingency costs arising from unfamiliarity among contractors and cost assessors. It’s essential to weigh achievable carbon savings alongside delivery capability and project risk.

For concrete, Boral Head of Product Solutions Nathan Barrell explains that reducing embodied carbon in Portland cement can be achieved by using fly ash, but that such substitution sometimes “slows down the whole construction process, which increases costs.”

Some mixes also experience greater drying shrinkage. Product-specific performance and price should be central to your comparison.

In 2021, it was estimated that, without action, embodied carbon would account for 85 per cent of Australia’s built-environment emissions by 2050, so the sense of urgency is growing.

Heat resistance is one of the clearest examples of why up-front carbon cannot be the only deciding factor. In schools and elsewhere, materials need to protect people, equipment and infrastructure, as well as support long-term energy performance.

Why heat-resistant materials for schools and public facilities prove the point: a case study

According to experts at McNeil, a specialist supplier of refractory materials since 1937, the best heat-resistant materials for schools and public facilities are those that match the equipment’s thermal demands and protect surrounding structures.

Refractory linings “prevent heat from escaping before it circulates to classrooms,” they explain. In your boiler specification, that connects material performance with energy demand and operational emissions.

McNeil also describes how refractories protect boiler and kiln steel shells and limit heat transfer to surrounding walls and floors, helping to prevent structural fire. The company warns that the wrong brick grade can lead to rapid failure and safety violations, noting that high-alumina brick is typically required for boilers due to its strength and thermal resistance.

This illustrates how a material with lower up-front carbon may still perform worse overall if it fails under thermal stress or causes more energy loss over time.

For boiler rooms, kilns and school laboratories, assess the actual temperature, exposure and equipment requirements with your designer.

A prematurely failed lining means another manufacturing and installation cycle, alongside the safety consequences. Any up-front carbon saving needs to survive that replacement calculation.

Protecting your investment through durability and circularity

Durability gives you another way to assess the carbon and capital tied up in materials.

Jessica French, Energy and Sustainability Manager at Brickworks Building Products, describes brick as weatherproof and low-maintenance, with “performance that will last a lifetime,” supporting its case for long service life. The company also highlights opportunities for brick reuse and recycling, leaning into the circular economy.

Over your 50-year assessment, compare a durable option’s initial emissions with the cumulative impact of replacing a shorter-lived alternative. Include maintenance access, labour and disruption in the cost assessment.

Protective linings follow the same logic by shielding longer-lived equipment. Ask how components will be removed and recovered so that circularity becomes a practical design consideration alongside durability.

A practical decision framework for Australian specifiers

Use these three checks to turn environmental product declarations (EPDs) and performance data into practical specifications:

  • Scrutinise EPDs beyond stage A3: Be aware that an EPD does not certify sustainability, so compare equivalent functions and declared life cycle stages, then include anticipated maintenance and replacement cycles across 50 years.
  • Zone by environmental exposure: Consider bio-based and low-carbon options in low-wear areas, then prioritise verified heat, abrasion and weather resistance where exposure demands it. Like-for-like decarbonisation strategies could reduce up-front carbon by 23 per cent and may deliver overall cost savings, so assess your carbon-reduction budget.
  • Factor in operational protection: Assess how insulation and protective materials reduce unwanted thermal losses, as refractory linings do for boiler systems. Include the resulting energy demand and equipment protection in your whole-of-life assessment.

Making material decisions that last as long as your building

Your material choices shape decades of maintenance, energy use and replacement decisions. On your next project, apply the framework zone by zone, compare service-life assumptions and document why each specification suits its exposure.

This approach can give your carbon and cost decisions a clearer connection to the building you intend to operate.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Asia‑Pacific Hydrogen Summit 2026

BEX Asia (The Built Environment Expo)

International Built Environment Week (IBEW)

International Built Environment Week (IBEW)

BEX Asia (The Built Environment Expo)

Construction Technology Leaders Summit

Construction Technology Leaders Summit

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
11 Nov

RMIT to lead new research hub to advance renewable energy and resource recovery

10 Nov

European Energy and AirTrunk open 31 MW Mulwala solar project in NSW

06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

11 Nov

WA invests $15M to establish vanadium battery facility

09 Nov

Climate group urges COP31 hosts to deliver pathway away from fossil fuels

09 Nov

Western Australia achieves 62% recycling rate in 2024-25

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required