Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Two solar farms and a battery could help power Nickel West mines

05 Aug, 2021
Image: A solar farm under construction.


BHP and Goldfields TransAlta have announced plans to build two solar farms and a battery storage system to help power the Mt Keith open-pit mine and the Leinster underground mine in Western Australia, which form a part of BHP’s Nickel West business.

The Northern Goldfields Solar Project is proposed to include a 27.4 MW solar farm at Mt Keith and a 10.7 MW solar farm and 10.1 MW battery at Leinster and will displace power currently supplied by diesel and gas turbine generation.

This will result in an estimated reduction of 540,000 tonnes of carbon dioxide equivalent over the first 10 years of operation. This is the equivalent of removing up to 23,000 combustion engine cars from the road every year.

TransAlta will build, own and operate the Northern Goldfields Solar Project. Total construction capital of the project is estimated at A$73 million.

Following an extensive tender process, TransAlta has entered into an engineering, procurement and construction agreement with juwi Renewable Energy Pty Ltd.

The project is the first renewable energy project to be developed under the Power Purchase Agreement TransAlta and BHP signed in October 2020.

Construction on the solar farms and battery is forecast to commence in the second quarter of 2022, take 12-14 months to complete, and at its peak, employ over 100 people on-site.

BHP Nickel West, Asset President, Eddy Haegel, said: “This is the first large-scale onsite solar farm and battery that BHP has commissioned at any of its global operations.”

“The Northern Goldfields Solar Project will further improve our position as one of the lowest carbon nickel miners in the world. It will reduce emissions from electricity use at Mt Keith and Leinster by 12 per cent, reduce fuel costs and improve the reliability of our electricity supply with the addition of the battery storage system.”

“This announcement follows the nickel supply agreement we signed with Tesla last week. Sustainable low carbon nickel is essential for our battery and electric vehicle customers,” Mr Haegel said.

TransAlta Corporation President and Chief Executive Officer, John Kousinioris, commented: “We are proud to be supporting BHP’s emissions reduction targets and sustainability goals through the expansion of our renewable generation footprint into Australia.”

The partnership will contribute to BHP’s medium-term target to reduce Scope 1 and 2 emissions from its operated assets by at least 30 per cent from FY2020 levels by FY2030.

The project remains subject to final WA state government approvals.

Related Articles

Connecting Hydrogen APAC 2025

Australia Wind Energy 2025

AUSTRALIAN ENERGY WEEK 2025

Australian Energy Week 2025

The Future Minerals Forum 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Jul

Federal government funds green iron project in Kwinana

09 Jul

US battery storage market growth defies uncertainty

09 Jul

RISE Accelerator applications have now closed

09 Jul

Sanderson unveils guideline supporting community benefits

03 Jul

Governments double solar battery incentives in NSW

10 Jul

FWPA launches national recycled timber standard

10 Jul

WorldGBC urges stronger building climate policies

25 Jun

Cool project reduces car park surface temperatures

25 Jun

Ocean Reef Marina achieves top sustainability certification

18 Jun

McNab wins Queensland Sustainability Award 2025

10 Jul

AI adoption accelerates the discovery of green ammonia

03 Jul

Pilbara aims to lead clean shipping as a green fuel bunkering hub

03 Jul

Denison Gas pioneers Australia’s energy storage transformation

25 Jun

Japanese scientists create plastic dissolving in seawater

25 Jun

Australia opens largest renewable hydrogen refuelling station

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required