Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Repurposing Broken Hill mine for renewable energy storage using compressed air

21 Oct, 2022
Render of the Silver City Energy Storage Centre. Image supplied.


The Australian Renewable Energy Agency (ARENA) has conditionally approved $45 million in funding to construct a 200 MW / 1600 MWh fuel-free energy storage facility, developed by Hydrostor Inc, utilising their Advanced Compressed Air Energy Storage (A-CAES) technology and repurposing a disused mine at Broken Hill, New South Wales.

ARENA’s funding for the Silver City Energy Storage Project, developed by Hydrostor, is conditional upon the project reaching financial close, which is expected to occur in late 2023.

Once built, the project will be one of the world’s largest compressed air projects, providing at least 8 hours of storage.

The $652 million project will re-purpose a disused mine to facilitate the development of a subsurface air-storage cavity that will be used to store compressed air.

The project operates by compressing air during times of low electricity prices, storing it and releasing it through a turbo-expander to generate electricity during times of high demand and high energy prices.

The project is supported by Transgrid which earlier this year announced Hydrostor’s A-CAES technology as the preferred solution in the Regulatory Investment Test for Transmission (RIT-T) to provide back-up power supply for the city of Broken Hill.

The project will reserve at least 250 MWh of storage for this back-up power service.

Hydrostor’s A-CAES technology provides an alternative to Pumped Hydro Energy Storage (PHES) for bulk energy storage, having a comparable price point and additional benefits including providing more flexible site selection, shorter development and construction times, and a lower environmental impact.

The flexible site selection allows Hydrostor’s A-CAES technology to target specific problems and capture new value steams, including fringe-of-grid applications such as at Broken Hill, Renewable Energy Zones (REZs), and off-grid applications.

ARENA CEO Darren Miller said new technologies for medium duration storage will help to improve the economics of energy storage and give us a range of options for our future energy storage needs.

“Whether it be through pumped hydro, or innovative solutions like compressed air storage, medium and long duration storage is going to be vital to supplying power during the evening and morning peak-demand periods as Australia looks towards achieving 82 per cent renewable energy by 2030.”

“Hydrostor’s innovative solution provides us with another option to add to the mix.

“As a fuel-free storage technology, compressed air storage technology has similar applications to pumped hydro, such as providing dispatchability required to ensure reliability of the power system as more solar and wind power is installed.”

“In Australia’s regional towns at the fringe of the grid such as Broken Hill, new large scale storage technologies can provide back-up power to communities that will improve the reliability of electricity supply.

“Having more grid scale storage will also support more solar and wind in regional areas,” he said.

Related Articles

2024 World Battery & Energy Storage Industry Expo (WBE)

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Jul

Federal government funds green iron project in Kwinana

09 Jul

US battery storage market growth defies uncertainty

09 Jul

RISE Accelerator applications have now closed

09 Jul

Sanderson unveils guideline supporting community benefits

03 Jul

Governments double solar battery incentives in NSW

10 Jul

FWPA launches national recycled timber standard

10 Jul

WorldGBC urges stronger building climate policies

25 Jun

Cool project reduces car park surface temperatures

25 Jun

Ocean Reef Marina achieves top sustainability certification

18 Jun

McNab wins Queensland Sustainability Award 2025

10 Jul

AI adoption accelerates the discovery of green ammonia

03 Jul

Pilbara aims to lead clean shipping as a green fuel bunkering hub

03 Jul

Denison Gas pioneers Australia’s energy storage transformation

25 Jun

Japanese scientists create plastic dissolving in seawater

25 Jun

Australia opens largest renewable hydrogen refuelling station

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required