Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Queensland invests in state-of-the-art biofuels hub in Brisbane

10 Jul, 2026



The Queensland government is investing AU$18.56 million to establish a cutting-edge biofuels project in Brisbane, aimed at strengthening the state’s fuel security and driving local innovation.

Funded through the government’s AU$180.6 million Sovereign Industry Development Fund (SIDF), the grant will enable local company Wildfire Energy to develop the Bulwer Island Biofuels Hub.

Located at the former Bulwer Island refinery site, the hub will feature a first-of-its-kind commercial reference plant capable of processing up to 30,000 tonnes of non-recyclable residual waste each year.

The project marks the commercial deployment of Wildfire Energy’s home-grown Moving Injection Horizontal Gasification (MIHG) technology, which converts hard-to-recycle waste into valuable energy products.

Phase one of the facility will generate bio-syngas to produce up to 1.4 megawatts of electricity annually, enough to power 1,000 homes.

Future phases are slated to unlock the production of bio-methanol and Sustainable Aviation Fuel (SAF), directly reducing the state’s reliance on imported fossil fuels.

Deputy Premier and Minister for State Development Jarrod Bleijie said the investment would revitalise Queensland’s sovereign biofuels capability and back a home-grown industry.

“This investment will help grow Queensland’s biofuels capability, strengthen our sovereign fuel supply chains and reduce reliance on imported fuels by supporting home-grown technology and manufacturing,” the minister said.

“The Bulwer Island Biofuels Hub will turn waste into a valuable fuel source while strengthening Queensland’s energy resilience.”

Construction on the facility is scheduled to begin in late 2026, with full commercial operations anticipated to commence in early 2028.

Wildfire Energy CEO Greg Perkins welcomed the funding, noting it provides a bridge from tech demonstration to commercial scale.

“The funding allows us to move to delivering Queensland’s first waste-to-biofuels commercial reference plant, creating jobs, attracting investment and supporting the growth of Queensland’s biofuels industry,” Perkins said.

“Bulwer Island gives us the opportunity to show how Queensland innovation can be used to turn hard-to-recycle waste into valuable products and help build new industries for the future.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

8th European Conference Future of Biofuels 

Bioenergy Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required