Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Queensland invests in state-of-the-art biofuels hub in Brisbane

10 Jul, 2026



The Queensland government is investing AU$18.56 million to establish a cutting-edge biofuels project in Brisbane, aimed at strengthening the state’s fuel security and driving local innovation.

Funded through the government’s AU$180.6 million Sovereign Industry Development Fund (SIDF), the grant will enable local company Wildfire Energy to develop the Bulwer Island Biofuels Hub.

Located at the former Bulwer Island refinery site, the hub will feature a first-of-its-kind commercial reference plant capable of processing up to 30,000 tonnes of non-recyclable residual waste each year.

The project marks the commercial deployment of Wildfire Energy’s home-grown Moving Injection Horizontal Gasification (MIHG) technology, which converts hard-to-recycle waste into valuable energy products.

Phase one of the facility will generate bio-syngas to produce up to 1.4 megawatts of electricity annually, enough to power 1,000 homes.

Future phases are slated to unlock the production of bio-methanol and Sustainable Aviation Fuel (SAF), directly reducing the state’s reliance on imported fossil fuels.

Deputy Premier and Minister for State Development Jarrod Bleijie said the investment would revitalise Queensland’s sovereign biofuels capability and back a home-grown industry.

“This investment will help grow Queensland’s biofuels capability, strengthen our sovereign fuel supply chains and reduce reliance on imported fuels by supporting home-grown technology and manufacturing,” the minister said.

“The Bulwer Island Biofuels Hub will turn waste into a valuable fuel source while strengthening Queensland’s energy resilience.”

Construction on the facility is scheduled to begin in late 2026, with full commercial operations anticipated to commence in early 2028.

Wildfire Energy CEO Greg Perkins welcomed the funding, noting it provides a bridge from tech demonstration to commercial scale.

“The funding allows us to move to delivering Queensland’s first waste-to-biofuels commercial reference plant, creating jobs, attracting investment and supporting the growth of Queensland’s biofuels industry,” Perkins said.

“Bulwer Island gives us the opportunity to show how Queensland innovation can be used to turn hard-to-recycle waste into valuable products and help build new industries for the future.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

8th European Conference Future of Biofuels 

Bioenergy Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
12 Aug

All 30 wind turbines erected for Warradarge wind farm

12 Aug

ENGIE advances Goorambat East solar farm in Victoria

11 Aug

Australian-backed solar project powering remote schools across Fiji

11 Aug

Türkiye aims for 5GW offshore wind with first major tender

10 Aug

420MW solar project begins construction in Mexico as FID is reached

12 Aug

U.S. Green Building Council appoints David Purcell as CMO

05 Aug

NSW backs large-scale hemp manufacturing for housing with $2m grant

31 Jul

Closure of NSW lighting scheme creates gap for warehouses and industrial sites

29 Jul

Stockland launches first net-zero energy village Ampére

28 Jul

NSW expands Greener Neighbourhoods Grants to combat urban heat

05 Aug

KETH project nears operation after award of EPC contract

05 Aug

Mining sector performance proves renewables work at scale

03 Aug

Investors favour flexible biopower over simple generation projects

29 Jul

Researchers find microbes turn mining waste into mobile nanoparticles

29 Jul

Latest NSW data confirms coal sector outpacing other industries on emissions reductions

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required