Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Port Kembla Power Station awarded CSSI status

27 Aug, 2021
Aerial image of the future Port Kembla Power Station. Photo Credit: GHD.


A proposed $1.3 billion hydrogen-gas turbine power station in Port Kembla has been declared Critical State Significant Infrastructure (CSSI), given its importance to renewable energy capacity in NSW.

Deputy Premier John Barilaro said this is a massive step towards safeguarding the state’s future energy security while providing jobs during challenging times.

“The Port Kembla Power Station will be a gamechanger, not just for NSW but Australia,” Mr Barilaro said.

“It will provide the energy capacity our state needs as existing coal-fired power stations reach their end of life, and household power bills will be the big winner as the project maintains downward pressure on prices.”

“The proposed dual-fuel power station, combining gas and green hydrogen, is the right project at the right time, and its CSSI declaration is another example of the NSW Government’s determination to forge ahead with a project that helps encourage other businesses to invest with confidence in the Illawarra.”

Minister for Planning and Public Spaces, Rob Stokes, said the proposed power station would produce up to 635 megawatts of electricity on demand and create 700 construction jobs.

“If approved, the Port Kembla Power Station will be a critical part of the NSW energy mix as we move to cleaner, greener renewables by firming up supply and keeping energy prices low,” Mr Stokes said.

“The NSW Government has a secure plan for the transition to renewables and the Port Kembla proposal should be declared CSSI because it will be vital to achieving a low-carbon emissions based economy.”

“Port Kembla is one of the state’s most valuable industrial hubs and provides local employment. The proposed gas turbine will support 35 jobs once up and running.”

Minister for Energy and Environment, Matt Kean, added that the proposed power station had committed to using up to 30 per cent green hydrogen.

“Port Kembla is the industrial engine room of our economy and one of the first hydrogen hubs in NSW,” Mr Kean said.

“If approved, the dual hydrogen-gas design of this project will create early demand for the green hydrogen needed to decarbonise the state’s heavy industries and set them up to succeed in a low carbon global economy.”

The proposed Port Kembla Power Station is being developed by Australian Industrial Power, a part of Tattarang’s energy division, Squadron Energy.

Subject to the execution of formal project, environmental and grid connection approvals, the power station could be operational and able to supply electricity to NSW customers from the summer of 2024-2025.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Greenhouse Gas Control Technologies Conference (GHGT)

ADIPEC 2026

7th European Conference Hydrogen & P2X 2026

7th European Conference Hydrogen & P2X 2026

World Hydrogen 2026

World Hydrogen 2026 Summit and Exhibition

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
13 Oct

Contract awarded for landmark solar system at Western Sydney Airport

13 Oct

LGI grows portfolio through two Queensland solar farm acquisitions

09 Oct

Atmos Renewables awards contract for Queensland battery project

09 Oct

Australia becomes first country to pledge to double global rooftop solar by 2030

07 Oct

Origin Energy lodges plans to expand Eraring BESS

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

09 Oct

AGL partners with Bega Group for large-scale rooftop solar project

07 Oct

Solar integration sets a new benchmark at Western Sydney International Airport

06 Oct

KGBS opens green building finance repository platform

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

13 Oct

Japanese energy giant opens $200M Queensland green hydrogen facility

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required