Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Newly ASX listed Gold Hydrogen readies to uncover natural hydrogen

13 Jan, 2023
ARENA funding for hydrogen export feasibility study



Gold Hydrogen Limited, focused on the discovery and development of natural hydrogen gas in South Australia, has listed on the Australian Securities Exchange (ASX).

The company raised $20 million in its initial public offering (IPO) through the issue of 40 million fully paid ordinary shares at an issue price of 50 cents each.

Gold Hydrogen chair Alexander Downer said: “To know we have the support of so many people in the hunt for low carbon energy sources, and that the search starts in my own state, is incredibly humbling.

‘Gold’ hydrogen is hydrogen that occurs naturally, generated by geological processes, and offers significant cost and emissions advantages relative to other means of hydrogen production. It does not require fracking or hydraulic stimulation to be produced.

Mr Downer said the project is an Australian first, and very exciting for South Australia and Australia.

“We need real solutions to decarbonise in ways that keep the lights on, and innovators like Gold Hydrogen will be essential to those goals.”

The combined natural hydrogen permit area of the Gold Hydrogen group is approximately 75,332 square kilometres.

Gold Hydrogen holds one granted petroleum exploration license (PEL 687) and its two 100 per cent owned subsidiary companies (White Hydrogen Australia and Byrock Resources) hold an additional seven applications for natural hydrogen exploration within South Australia

An airborne gravity-magnetic survey is scheduled to begin in March; the permit application was lodged on 22 December 2022 with the South Australian Department for Energy and Mining.

Two-dimensional seismic reprocessed completed in December 2022 has significantly improved subsurface architecture and identified additional leads outside existing prospects.

Related Articles

Connecting Hydrogen APAC 2025

Hydrogen Technology Conference & Expo

Hydrogen Technology Conference & Expo

Wood Mackenzie Hydrogen Conference

Wood Mackenzie Hydrogen Conference

Wood Mackenzie Hydrogen Conference 2024

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Jul

Federal government funds green iron project in Kwinana

09 Jul

US battery storage market growth defies uncertainty

09 Jul

RISE Accelerator applications have now closed

09 Jul

Sanderson unveils guideline supporting community benefits

03 Jul

Governments double solar battery incentives in NSW

10 Jul

FWPA launches national recycled timber standard

10 Jul

WorldGBC urges stronger building climate policies

25 Jun

Cool project reduces car park surface temperatures

25 Jun

Ocean Reef Marina achieves top sustainability certification

18 Jun

McNab wins Queensland Sustainability Award 2025

10 Jul

AI adoption accelerates the discovery of green ammonia

03 Jul

Pilbara aims to lead clean shipping as a green fuel bunkering hub

03 Jul

Denison Gas pioneers Australia’s energy storage transformation

25 Jun

Japanese scientists create plastic dissolving in seawater

25 Jun

Australia opens largest renewable hydrogen refuelling station

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required