Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Fortescue produces first low-emissions metal at Christmas Creek

20 Aug, 2026
First hot metal – Christmas Creek Source: Fortescue


Fortescue has achieved a breakthrough in its pursuit of low-emissions steelmaking, producing its first batch of hot metal at the Christmas Creek green metal project in Western Australia’s Pilbara region.

The milestone represents the first operational success of the facility’s electric smelting furnace, providing a critical proof-of-concept for processing native Pilbara iron ore into commercial-grade green metal.

The pilot trial forms part of Fortescue’s broader strategy to establish a local downstream processing industry rather than relying solely on raw mineral exports.

Initial molten metal output was achieved using a blended ore feedstock as part of progressive site commissioning. Operations will now advance through phased testing to refine, optimise, and scale up the technology.

Fortescue Metals CEO Dino Otranto described it a pivotal step towards building commercial-scale green metal operations on home soil.

“For decades Australia has exported iron ore to the world. The next opportunity is to create more value from that ore by producing green metal here at home,” Otranto said.

“Australia has some of the world’s best renewable energy resources and one of the world’s largest iron ore industries. That’s a competitive advantage we should be building on. If we don’t, other renewable-rich countries will.”

Otranto noted that commercialising green iron derived from Pilbara ore remains an unsolved global engineering challenge.

Standard low-carbon ironmaking technologies generally require high-grade ores, making the processing of lower-grade Pilbara ores a major technical hurdle for global steel decarbonisation.

“The real opportunity goes beyond green metal. It’s about building a new industrial economy around Australia’s renewable energy advantage,” Otranto said.

“Nobody has solved green metal production using Pilbara ore at commercial scale yet. That’s the challenge we’re taking on.”

Fortescue will continue phased commissioning at the Pilbara facility to evaluate operational parameters before making further commitments towards scaled commercial production.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Oct

Victoria gives green light to Southern Hemisphere’s largest wind farm

16 Oct

ARENA launches Round 3 of Solar Sunshot program with solar manufacturing focus

16 Oct

WA awards major Clean Energy Link contract to local firms

15 Oct

Transmission bottlenecks risk Sweden’s clean energy expansion

14 Oct

ARENA commits to Australian solar farm robot manufacturing

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

09 Oct

AGL partners with Bega Group for large-scale rooftop solar project

07 Oct

Solar integration sets a new benchmark at Western Sydney International Airport

06 Oct

KGBS opens green building finance repository platform

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

14 Oct

Carbonxt secures expanded US supply deal, boosting FY27 outlook

13 Oct

Japanese energy giant opens $200M Queensland green hydrogen facility

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required