Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Exmouth Gulf proposals to be subject to cumulative impact study

28 Aug, 2020
Image: Exmouth Gulf with heavy cloud at top and rocky cliff in foreground via. Shutterstock.


Under section 16(e) of the Environmental Protection Act 1986, Minister for the Environment, the Hon. Stephen Dawson MLC, has requested the Western Australian Environmental Protection Authority (EPA) provide strategic advice on the potential cumulative impacts of proposed activities and developments in the Exmouth Gulf. The EPA has agreed to the request.

Minister Dawson has determined that new, and in some cases very recent proposals, such as the Gascoyne Gateway Cruise and Multi-Use Marine Facility, the K+S Salt proposal and the Learmonth pipeline fabrication project have the potential to significantly add to these impacts.

It is important that the Environment Minister understands the current social, cultural and environmental values in the Gulf prior to making a decision on any future proposals that may impact on these values.

The EPA has advised that its assessment periods for Subsea 7’s Learmonth Pipeline Fabrication Facility proposal and the Shire of Exmouth’s rezoning proposal will be extended so that the findings from the cumulative impact study can be fully considered.

Subsea 7 is proposing to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35 kilometres south of the Exmouth Townsite.

The onshore pipeline fabrication site and associated infrastructure is proposed to include two Bundle tracks (approximately 10 kilometres in length) along which the Bundles would be constructed and launched from a Bundle launchway that crosses the beach and extends into the subtidal zone at Heron Point in the Exmouth Gulf.

Once launched, the Bundles would be towed along a pre-determined route between two tugs at a controlled depth to the Bundle Parking area within which tow reconfiguration may occur before continuing offshore. The Bundles would be towed at the surface through the Ningaloo Marine Park and Ningaloo World Heritage Area.

The Shire of Exmouth is proposing to rezone part of lots 223, 234, 235 and 1586 Minilya-Exmouth Road, Learmonth from ‘Rural’ and ‘Foreshore Reserve’ to ‘Special Use 10’ to facilitate the development of the proposed Learmonth Pipeline Fabrication Facility.

“The Exmouth Gulf is under increasing pressure from a range of activities and users and this is an opportunity to better understand the potential impacts before any significant development gets underway,” Minister Dawson said.

“Understanding any potential impacts that future developments may have on Exmouth Gulf will enable me to make an informed decision about these future proposals.”

The EPA is expected to provide the Minister with its advice on Exmouth Gulf at the end of June 2021.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Connecting Hydrogen APAC 2025

Australia Wind Energy 2025

AUSTRALIAN ENERGY WEEK 2025

Australian Energy Week 2025

5th World ESG Summit

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Sep

PolarBlue to build clean energy manufacturing hub in Tasmania

15 Sep

Australian governments legalise plug-in solar panels and batteries

09 Sep

Octopus Australia submits proposal for Queensland BESS

09 Sep

Victorian solar company fined $100,000 for repeated fall risks

09 Sep

Tasmania releases draft rules for data centre and AI growth

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

28 Aug

UNSW campus fit-out targets green interiors rating

28 Aug

New CDU pilot program turns waste into community resources

14 Sep

Construction begins on Canada’s largest CCS hub

10 Sep

Australia’s environmental law reforms set to streamline project approvals, protect environment

09 Sep

Eni, PETRONAS partner to develop innovative biofuel solutions

09 Sep

Rendering transforms waste into billion dollar exports

03 Sep

ARENA backs green iron firm Element Zero with $26M funding

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required