Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Australia risks losing battery plants overseas

01 Oct, 2026



Battery material manufacturer Sicona Battery Technologies is calling for more late-stage growth capital investment into critical minerals and battery materials manufacturing, as Australia seeks to capture its share of $16.9 billion in forecast annual battery value-add.

Sicona says increased local capital will be critical to building onshore battery materials plants, after the UK backed a competitor, Nexeon, with £52.6 million and the US offered another, Sila Nanotechnologies, a conditional loan of up to US$1.4 billion.

Both governments are funding silicon-carbon anode manufacturing, the exact category Sicona operates in.

The UK National Wealth Fund’s commitment to Nexeon on 31 August completed a £100 million round that also drew the Korea Development Bank and Honda Xcelerator Ventures.

The US Department of War’s Office of Strategic Capital signed its commitment with Sila on 7 August to expand silicon-carbon anode manufacturing at Moses Lake, Washington, and build a lithium-ion battery cell plant.

That funding targets the middle of a lithium-ion supply chain that begins in Australia, which produced 45 per cent of the world’s lithium in 2023 despite making less than 1 per cent of global battery materials or components.

Research shows this segment could create 61,400 local jobs alongside the $16.9 billion of value predicted by 2030, but the return depends on Australia building the plants it has so far left to other countries.

The ARENA Battery Breakthrough Initiative has awarded Sicona $45 million towards its first commercial-scale silicon-carbon anode facility inside BlueScope’s Port Kembla precinct.

The $100 million project is expected to lift production 300-fold to 230 tonnes a year and create up to 72 skilled manufacturing jobs, in a sector that has seen an estimated 14 per cent decline over 20 years, with 8700 jobs lost in the year to February 2026.

Sicona is seeking another $55 million of equity capital to complete the facility.

With the Battery Breakthrough Initiative closed to new applications, the National Reconstruction Fund and its renewables and low-emission technologies priority area is expected to carry the next stage of Australian battery manufacturing: construction finance.

That funding could stop battery companies from looking overseas, as Novonix did in securing a conditional loan of up to US$754.8 million from the US Department of Energy.

Sicona this month acquired US-based Advano, expanding its patent portfolio to 151 patents across 46 patent families and strengthening the technology it plans to manufacture at Port Kembla.

The acquisition supports its pathway to commercialising the technology in Australia, with plans for Port Kembla unchanged.

Founder and CEO Christiaan Jordaan said Australia has the foundations in place, with ARENA backing the first commercial plant and a government discussing a higher risk appetite and faster decisions.

He said every company in this category needs construction finance after grants and venture capital reach their limit.

“We have the technology, we have been through ARENA’s diligence, and we have the site at Port Kembla, so Australia is closer to a working silicon-carbon anode plant than most people realise,” he said.

NOAB Ventures Director John Wood said the pattern Sicona describes appears across the portfolio he invests in, where construction finance becomes the hard part once seed and venture money has taken a company to the building stage.

He said: “Australia has built genuine strength in inventing this technology, and the opportunity now is to back it through to manufacturing rather than watching another country fund the factory.”

Sicona says Australia can build the plant onshore if construction funding moves quickly enough.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Connecting Hydrogen APAC 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required