Subscribe to Newsletter
  • ACQUIRE
  • JAPAN ENERGY SUMMIT

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

World’s biggest hydrogen plant could power Australia’s first fully decarbonised ammonia facility in Brisbane

13 Oct, 2022
Aerial view of Gibson Island. Image supplied.


Australia’s first large scale project to decarbonise an existing ammonia plant using renewable hydrogen is set to get underway, with the Australian Renewable Energy Agency (ARENA) supporting a front-end engineering and design (FEED) study at Brisbane’s Gibson Island.

On behalf of the Australian Government, ARENA has today announced $13.7 million in funding to Fortescue Future Industries Pty Ltd (FFI) in partnership with Incitec Pivot Limited (IPL) to support a FEED study for the development of a large scale renewable hydrogen production facility and conversion of IPL’s existing Gibson Island ammonia plant to utilise 100 per cent renewable hydrogen produced by the hydrogen facility.

FFI (a wholly owned subsidiary for Fortescue Metals Group (FMG)) and IPL’s $38 million project would be looking to investigate the deployment of a 500 MW electrolyser, capable of producing up to 70,000 tonnes of renewable hydrogen per year.

The study will also consider the conversion requirements for IPL’s existing ammonia plant to utilise the renewable hydrogen production and offtake approximately 400,000 tonnes of renewable ammonia per year.

If successful, the electrolyser will be one of the largest in the world, feeding renewable hydrogen into the first fully decarbonised renewable ammonia facility.

The study will also generate important learnings for the industry, developing benchmarks for the economics of large scale renewable hydrogen and ammonia production in Australia, improving the understanding of the technical and commercial feasibility of large scale electrolyser deployments.

The study will also provide insights into the feasibility of converting existing ammonia production facilities to utilise renewable hydrogen, and help to further understand the market for renewable ammonia in Australia and internationally.

Ammonia production is a highly energy intensive process, producing about 500 million tonnes annually of carbon dioxide as a result, which is around 1.8 per cent of global carbon emissions, similar in scale to the aviation industry.

Ammonia is used in agriculture and industry, with up to 80 per cent of ammonia used to make fertiliser, and the remaining 20 per cent used for industrial purposes such as manufacturing explosives and plastics.

ARENA CEO Darren Miller said the project would significantly accelerate the development of a renewable ammonia industry in Australia.

“This is an exciting project for the parties involved and for Australia. Having the ability to reutilise ageing assets and repurposing them to use renewable energy will not only help to keep costs down in the future, but also ensure skilled workers are retained as we continue our transition to net zero emissions,” Mr Miller said.

“Having been involved in the development of Australia’s earliest renewable hydrogen projects, large industrial players are now seeing the potential benefits of hydrogen and looking to build even larger projects.

“Ultimately, our goal is to reduce the cost of producing hydrogen at scale so it can outcompete hydrogen made with fossil fuels.

“If we can improve the economics of renewable hydrogen, we can realise our collective vision of decarbonising hard to abate sectors and establishing significant new export markets,” he said.

ARENA recently announced $47.5 million in conditional funding to ENGIE to build a 10 MW electrolyser which will produce renewable hydrogen to be fed into Yara Pilbara Fertilisers ammonia facility in Karratha, WA.

ARENA has also previously committed $88 million to renewable hydrogen projects spanning feasibility studies, small scale electrolyser demonstrations, gas blending trials and vehicle deployments.

Related Articles

Connecting Green Hydrogen Japan 2024

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 May

Snowy 2.0 workers strike over pay disparity

16 May

Long-duration batteries key to renewable reliability

16 May

Rural not-for-profits drive clean energy in regional Australia

13 May

NSW unveils 10 Central-West Orana renewables projects

13 May

Australia’s grid hits record 43 per cent renewables in 2025

13 May

ResiLoop drives Melbourne flooring waste recycling revolution

13 May

Melbourne housing growth exposes environmental crisis

08 May

NABERS SPI 2025 launches milestone

29 Apr

Salta achieves first 5-Star Green Star industrial milestone

28 Apr

GCCA launches world’s first low carbon ratings system

13 May

Queensland resources sector drives energy transition

08 May

Global energy mix shifts slowly toward fuel alternatives

08 May

Clean energy mineral rush fuels rights abuses

29 Apr

Mitsui invests $1b in US low-carbon ammonia project

24 Apr

Collie’s industrial transformation accelerates with major project milestones

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required