Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

WA allocates $1.68M to fund renewable hydrogen feasibility studies

08 Jan, 2020



The Western Australian Government has today announced that it will invest $1.68 million to support feasibility studies across seven proposed renewable hydrogen projects for Western Australia to support further development of the industry.

The studies, funded through the State Government’s Renewable Hydrogen Fund, include examining creating solar hydrogen for waste collection and light vehicle fleets in Cockburn, a hydrogen refuelling hub in Mandurah and the potential for an electrolysis hydrogen production plant in the Great Southern or Wheatbelt.

Other proposals include a standalone power system for an indigenous community in the Pilbara using 100 per cent renewable energy, a hydrogen production facility near Kununurra using existing hydro generation, examining the compatibility of the Dampier to Bunbury natural gas transmission pipeline with blended hydrogen and looking at the integration of renewable hydrogen with isolated power stations.

The seven studies align with the strategy’s four Strategic Focus Areas of export, remote applications, blending in natural gas networks and transport.

Regional Development Minister, Alannah MacTiernan, said Western Australia needs to explore how it can produce, use and provide energy to international partners through clean and reliable sources, and renewable energy via hydrogen provides a means to do this.

“These feasibility studies will facilitate significant private sector investment and leverage financial support for a job-creating renewable hydrogen industry in WA,” she said.

“We received 19 feasibility study applications of which seven have been selected: confirming there is strong interest in developing a renewable hydrogen industry in WA.”

“The projects being investigated have the potential to create new jobs, skills and training opportunities – particularly in regional Western Australia,” the Minister added.

 

Below is a list of the successful feasibility study applications:

Applicant: ATCO Australia Pty Ltd

Feasibility Study: Clean Energy Innovation Park

Feasibility study for a 10 MW electrolysis hydrogen production plant.

Strategic Focus Area: Transport and blending in the gas network

Grant amount: $375,225

 

Applicant: City of Cockburn

Feasibility Study: Green Hydrogen for City of Cockburn

Feasibility study for solar hydrogen production for waste collection and light vehicle fleets. The study also examines cogeneration opportunities for electricity and heat production.

Strategic Focus Area: Transport

Grant amount: $149,412

 

Applicant: DBNGP (WA) Nominees Pty Ltd

Feasibility Study: Preparing the Dampier to Bunbury Natural Gas Pipeline for Hydrogen

Feasibility study examining the compatibility of the transmission pipeline with blended hydrogen, includes preparing a roadmap for the development of regulations for hydrogen blended gas in WA.

Strategic Focus Area: Blending in the gas network

Grant amount: $216,000

 

Applicant: Energy Developments Limited

Feasibility Study: Hyer Penetration – EDL Hydrogen Enabled Hybrid Renewables

Feasibility study for the integration of renewable hydrogen production with isolated power stations.

Strategic Focus Area: Remote applications

Grant amount: $242,500

 

Applicant: Hazer Group Limited

Feasibility Study: Renewable Hydrogen Transport Hub in the City of Mandurah

Feasibility study for a hydrogen refuelling infrastructure hub and associated transport applications.

Strategic Focus Area: Transport

Grant amount: $250,000

 

Applicant: Murdoch University

Feasibility Study: Hybrid PV-Battery-Hydrogen System for Microgrids

Feasibility study for 100 per cent renewable energy standalone power system for an indigenous community in the Pilbara. The study includes the development of a new modelling tool to optimise design.

Strategic Focus Area: Remote application

Grant amount: $75,000

 

Applicant: Pacific Hydro Australia Developments Pty Ltd

Feasibility Study: Ord Hydrogen

Feasibility study for hydrogen production facility near Kununurra utilising existing hydro generation.

Strategic Focus Area: Export, Transport and Remote applications

Grant amount: $370,000

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

7th European Conference Hydrogen & P2X 2026

7th European Conference Hydrogen & P2X 2026

World Hydrogen 2026

World Hydrogen 2026 Summit and Exhibition

Hydrogen

Hydrogen Conference

China International Hydrogen Congress and Expo (CIHC 2026)

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
05 Jun

Frontier secures $110M equity raising for Waroona solar battery project

05 Jun

Australian households lead world on battery and solar adoption

04 Jun

Record battery and solar growth reshaping Australia’s energy grid

04 Jun

Envision Energy and Impact Electrons Siam to develop Southeast Asia’s largest future energy system in Laos

04 Jun

Recharge Power and Energy Decarb launch Australian JV, targeting renewable projects

04 Jun

Researchers create yeast-based bio material for buildings

28 May

Europe’s insulated homes are failing in the heat

25 May

Victoria tightens insulation rules to improve retrofit practices

20 May

All tiers of government invest $54M in Queensland’s organic waste processing

20 May

Albany’s electrification extended with gas phase‑out delayed to 2027

05 Jun

BHP and GCMD trial multi-feedstock biofuel to decarbonise shipping

05 Jun

WA government invests in solar and battery recycling to recover critical minerals

29 May

MGA Thermal starts FEED study for Australia’s largest industrial thermal storage project

28 May

Traditional Owners and BHP to explore Pilbara-wide renewable network

26 May

Fortescue accelerates Real Zero with construction of Turner River solar project

  • Smart Energy south australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • Flow Batteries

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required