Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Vast advances utility-scale concentrated solar thermal plant

05 Jun, 2023
Vast’s 1.1 MW CSP Demonstration Plant in Forbes, Australia was operated for 32 months.


Vast Solar Pty Ltd, a renewable energy company specialising in concentrated solar thermal power (CSP) energy systems that generate zero-carbon, utility-scale, dispatchable electricity and industrial process heat, has awarded Worley Ltd. key engineering contracts for its VS1 CSP project.

Basic engineering is to be completed by July with ground breaking slated for 2024.

VS1 is a 30MW / 288 MWh CSP plant being built in Port Augusta, South Australia. Utilising Vast’s proprietary modular tower CSP v3.0 technology, VS1 will generate clean, low-cost, dispatchable power with over 8 hours of thermal energy storage. The project will create dozens of green manufacturing jobs, hundreds of jobs during construction and long-term plant operations roles.

Vast has appointed Worley and its specialist consulting division, Advisian, to complete VS1 basic engineering by July 2023, followed by front-end engineering design (FEED) in the balance of this calendar year. Construction of VS1 is on track to begin in 2024.

“With strong expertise in CSP, Worley and Advisian are the ideal engineering partners for VS1, which will utilise our industry-leading technology to capture and store the sun’s energy during the day before generating heat and dispatchable power during the day or night,” said Craig Wood, CEO of Vast.

“Vast has a long-standing relationship with Worley and Advisian dating back to assistance with the engineering and commissioning of our 1.1MW grid connected Jemalong demonstration plant,” added Wood.

“Their skill in integrating our technology with major packages to be delivered by key equipment partners from around the world will allow VS1 to progress towards FID late this year.”

Vast’s proprietary CSP v3.0 technology has received significant support from the Australian government. Most recently, the Australian Renewable Energy Agency (ARENA) announced it has approved up to AU$65 million in funding to support construction of VS1.

VS1 will be co-located with Solar Methanol 1 (SM1), a world-first green methanol demonstration plant which, in February, was selected to receive AU$19.48 million and EUR13.2 million from a collaboration between the Australian and German governments, respectively. SM1 will use zero emissions dispatchable electricity and heat from VS1 to produce green methanol for use as a sustainable shipping fuel.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

18th Solar PV & Energy Storage World EXPO

18th Solar PV & Energy Storage World EXPO

Solar and Storage Live

Solar and Storage Live

Solar & Energy Storage Summit 2025

Solar & Energy Storage Summit 2025

SOLAR AND STORAGE LIVE QUEENSLAND

SOLAR AND STORAGE LIVE QUEENSLAND

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
12 Mar

Foresight expands portfolio with acquisition of New Zealand’s NZ Clean Energy

12 Mar

New guide proposes partnership with communities for renewable projects

11 Mar

Octopus Australia breaks ground on AU$900 million Blind Creek project

11 Mar

Thousands of apprentices prepare for renewable careers in Australia

10 Mar

Iberdrola enters Victorian market with Ararat wind farm acquisition

12 Mar

WorldGBC and C40 partner to decarbonise cities

12 Mar

Sustainable building demands proper cooling recovery

25 Feb

Western Australia to build new water pipeline to enable sustainable supply in Guilderton

25 Feb

Policy shift in Victoria promotes efficient land use

25 Feb

Recycled glass strengthens construction’s circular future

11 Mar

New ICMM data reveals mining’s vital role in green transition

11 Mar

COOloop transforms captured carbon into acetic acid

10 Mar

Hyterra, Prometheus to demonstrate end-to-end geologic hydrogen production

10 Mar

Researchers uncover major gap in battery recycling

09 Mar

NSW approves green hydrogen and ammonia project for Moree farms

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required