Subscribe to Newsletter
  • ACQUIRE
  • JAPAN ENERGY SUMMIT

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Vanadium battery to power regional Western Australia

01 Aug, 2023
Vanadium



Western Australia’s regional energy provider Horizon Power has purchased a vanadium redox flow battery for a long-duration energy storage pilot in Kununurra.

The 78-kilowatt/220kWh battery will enable Horizon Power to test the capabilities of providing long periods of 100 per cent renewable energy, with the potential for it to be used across WA.

Horizon Power has signed an agreement with VSUN Energy, a subsidiary of Australian Vanadium Limited, for the purchase, installation, and commissioning of the vanadium battery.

Vanadium batteries are temperature resilient in harsh environments, have a long duration capacity, and provide stable energy storage.

The battery can store high volumes of excess energy and provide backup power during times of peak demand or when power supply is interrupted.

It also minimises the need for costly fossil fuel generation and grid infrastructure upgrades.

The technology has the potential to provide a long-term solution for microgrids and off-grid power systems.

This pilot will provide key learnings around how the technology can be effectively integrated into Horizon Power’s network.

The battery is expected to arrive in Perth early 2024. After successful testing, it will then be transported to Kununurra.

The Cook Government recently allocated $625 million for Kwinana Battery Stage Two, which is expected to be operational late 2024.

Energy Minister Bill Johnston said vanadium redox flow batteries are specifically designed to deliver energy over a long period of time, which is crucial for achieving the high levels of decarbonisation we are after.

“If the pilot is successful, there is potential to expand the use of long-duration, 100 per cent renewable energy across Horizon Power’s 2.3 million square-kilometre network.”

Related Articles

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

The Australian Energy & Battery Storage Conference

Aggreko

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 May

Snowy 2.0 workers strike over pay disparity

16 May

Long-duration batteries key to renewable reliability

16 May

Rural not-for-profits drive clean energy in regional Australia

13 May

NSW unveils 10 Central-West Orana renewables projects

13 May

Australia’s grid hits record 43 per cent renewables in 2025

13 May

ResiLoop drives Melbourne flooring waste recycling revolution

13 May

Melbourne housing growth exposes environmental crisis

08 May

NABERS SPI 2025 launches milestone

29 Apr

Salta achieves first 5-Star Green Star industrial milestone

28 Apr

GCCA launches world’s first low carbon ratings system

13 May

Queensland resources sector drives energy transition

08 May

Global energy mix shifts slowly toward fuel alternatives

08 May

Clean energy mineral rush fuels rights abuses

29 Apr

Mitsui invests $1b in US low-carbon ammonia project

24 Apr

Collie’s industrial transformation accelerates with major project milestones

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required