Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Vanadium battery to power regional Western Australia

01 Aug, 2023
Vanadium



Western Australia’s regional energy provider Horizon Power has purchased a vanadium redox flow battery for a long-duration energy storage pilot in Kununurra.

The 78-kilowatt/220kWh battery will enable Horizon Power to test the capabilities of providing long periods of 100 per cent renewable energy, with the potential for it to be used across WA.

Horizon Power has signed an agreement with VSUN Energy, a subsidiary of Australian Vanadium Limited, for the purchase, installation, and commissioning of the vanadium battery.

Vanadium batteries are temperature resilient in harsh environments, have a long duration capacity, and provide stable energy storage.

The battery can store high volumes of excess energy and provide backup power during times of peak demand or when power supply is interrupted.

It also minimises the need for costly fossil fuel generation and grid infrastructure upgrades.

The technology has the potential to provide a long-term solution for microgrids and off-grid power systems.

This pilot will provide key learnings around how the technology can be effectively integrated into Horizon Power’s network.

The battery is expected to arrive in Perth early 2024. After successful testing, it will then be transported to Kununurra.

The Cook Government recently allocated $625 million for Kwinana Battery Stage Two, which is expected to be operational late 2024.

Energy Minister Bill Johnston said vanadium redox flow batteries are specifically designed to deliver energy over a long period of time, which is crucial for achieving the high levels of decarbonisation we are after.

“If the pilot is successful, there is potential to expand the use of long-duration, 100 per cent renewable energy across Horizon Power’s 2.3 million square-kilometre network.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Show

The Battery Show Asia – Indonesia

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Aggreko

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
22 Jan

CEFC invests AU$70 million in infrastructure fund to boost energy transition

22 Jan

UNSW engineers set world record for solar cell material

16 Jan

Fortescue begins construction on first wind project

14 Jan

Solar and wind farms spill power amid oversupply

14 Jan

Neoen advances 500 MW Wheatbelt wind project

19 Jan

WA unveils landmark Urban Greening Strategy

15 Jan

Cement kilns safely transform unrecyclable global waste

14 Jan

2025 marked peak Green Star sustainability in Australian buildings

19 Dec

RICS report shows AI could boost green infrastructure

17 Dec

CEFC urges investors to lead green data centres growth

20 Jan

Monash scientists develop greener battery recycling

16 Jan

Rio Tinto to supply Amazon with low-carbon copper for AI data centres

16 Jan

Prometheus reveals breakthrough process for synthetic kerosene   

14 Jan

‘Breathing batteries’ store energy and carbon

14 Jan

New project advances Iron Nitride magnet production

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required