Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

UGL selected to construct 35-megawatt battery for Alinta Energy

24 May, 2023
UGL



CIMIC Group’s UGL has been selected to install a 35-megawatt one-hour battery energy storage system (BESS) facility in Port Hedland, Western Australia for Alinta Energy.

UGL will be responsible for the design, testing and commissioning of the BESS, which consists of a battery storage and power conditioning system at the Port Hedland Power Station.

UGL will also be responsible for an extension to the existing high voltage infrastructure for connection of the BESS.

CIMIC Executive Chairman Juan Santamaria said: “We are pleased to deliver our experience to this growth project – a major energy storage project in Port Hedland – for our client Alinta Energy.

“Projects in high-tech, energy transition and sustainable infrastructure are a key focus for our Group.”

UGL Managing Director Doug Moss said: “UGL is a market leader in the design, construction and operation of energy assets across Australia.

“We look forward to continuing our relationship with Alinta Energy to provide a safe and effective outcome for their Port Hedland project.”

UGL has commenced work on the project, which is expected to be completed in late 2024.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
15 Jun

China advances grid-forming renewable project to solve power instability

15 Jun

Mercy Health expands solar program across aged care homes

11 Jun

Gamuda Renewables enters Victoria market with Latrobe Valley solar and battery deal

11 Jun

Sydney’s Barangaroo secures net-zero future with completion of fourth solar farm

09 Jun

Ark Energy secures grid connection for Richmond Valley project

12 Jun

Rising costs slow household shift to green energy

10 Jun

Commercial building roofs present untapped renewable energy resource

04 Jun

Researchers create yeast-based bio material for buildings

28 May

Europe’s insulated homes are failing in the heat

25 May

Victoria tightens insulation rules to improve retrofit practices

15 Jun

Western Australia to invest $9.8M to develop Australia’s first low-emissions steel mill

11 Jun

Bellevue Gold runs six days of emission-free mining operations

11 Jun

Cyan Ventures launches Australia’s first green fuels accelerator

08 Jun

Australian government needs to prioritise trade deals to support green iron ore sector

05 Jun

BHP and GCMD trial multi-feedstock biofuel to decarbonise shipping

  • Smart Energy south australia

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • Flow Batteries

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required