Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

OX2 starts construction of solar power and battery hub in New South Wales

21 May, 2026
Renewables surge, solar and wind dominate



Renewable energy developer OX2 has started construction on its Muswellbrook solar farm and battery project in New South Wales, comprising 135 megawatts (MWac) of solar generation alongside a 100-megawatt battery energy storage system (BESS).

Located within the Hunter Central Coast Renewable Energy Zone (REZ), the project is expected to generate approximately 347 gigawatt-hours of clean electricity annually. This output will provide enough renewable energy to power roughly 52,000 Australian homes.

In a symbolic shift for the region, the project is being constructed predominantly on land previously used for coal mining operations.

Resource company Idemitsu Australia co-developed the precinct with OX2 and will remain involved as the site’s long-term landholder.

“I’m proud of the work that has brought this project to life and of our contribution to strengthening the energy supply in New South Wales. The investment highlights our long-term commitment to Australia and supports our growth as an independent power producer,” says Matthias Taft, CEO OX2.

The project has already secured commercial viability with the Muswellbrook solar farm signing a long-term hybrid power purchase agreement with an international offtaker.

The deal covers both the solar output and the battery storage capacity. Global banking giant MUFG is backing the development as the sole structuring coordinator, lead arranger, underwriter, and bookrunner for the project’s financing.

To ensure local residents benefit from the transition, OX2 will fund community development initiatives via a Voluntary Planning Agreement (VPA) locked in with the Muswellbrook Shire Council.

Construction on the precinct has commenced, with full completion and grid commissioning slated for 2028.

Since entering the Australian market in 2023, OX2 has rapidly built a massive three-gigawatt development pipeline spanning solar, wind, and storage projects across five states.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
12 Aug

All 30 wind turbines erected for Warradarge wind farm

12 Aug

ENGIE advances Goorambat East solar farm in Victoria

11 Aug

Australian-backed solar project powering remote schools across Fiji

11 Aug

Türkiye aims for 5GW offshore wind with first major tender

10 Aug

420MW solar project begins construction in Mexico as FID is reached

12 Aug

U.S. Green Building Council appoints David Purcell as CMO

05 Aug

NSW backs large-scale hemp manufacturing for housing with $2m grant

31 Jul

Closure of NSW lighting scheme creates gap for warehouses and industrial sites

29 Jul

Stockland launches first net-zero energy village Ampére

28 Jul

NSW expands Greener Neighbourhoods Grants to combat urban heat

05 Aug

KETH project nears operation after award of EPC contract

05 Aug

Mining sector performance proves renewables work at scale

03 Aug

Investors favour flexible biopower over simple generation projects

29 Jul

Researchers find microbes turn mining waste into mobile nanoparticles

29 Jul

Latest NSW data confirms coal sector outpacing other industries on emissions reductions

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required