Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Neoen expands the size of its Western Downs Battery

26 Jul, 2023
Western Downs



Neoen has announced the expansion of its Western Downs Battery in Queensland, which will have a total installed capacity of 270 MW / 540 MWh.

The expansion will be delivered by Tesla and construction contractor UGL who commenced construction of the initial stage of the project in January 2023.

The project is located on Barunggam country near the town of Chinchilla in South West Queensland.

With its greater capacity, the battery intends to play an even more central role in Queensland’s rapidly accelerating energy transition which is resulting in a growing need for storage and related network services.

Western Downs Battery, consisting of Tesla Megapack 2XL units, leverages the existing infrastructure of Neoen’s Western Downs Green Power Hub. The Hub includes Australia’s largest solar farm at 460 MWp capacity, which has recently been commissioned.

The will be capable of performing a range of network services to the Queensland grid, including firming renewables, providing frequency services and transmission network support.

With support from ARENA’s Large Scale Battery Storage Funding Round, the battery will ultimately be equipped with grid-forming inverter technology, allowing it to provide essential system stability services.

Queensland’s transmission network operator Powerlink will be delivering the project’s connection works and a dedicated high-voltage line into the Western Downs substation.

Powerlink Queensland CEO Paul Simshauser said: “Batteries will continue to play a critical role in the changing generation mix as we work towards a low emissions future.

“Increasing the capacity of Neoen’s Western Downs Battery to store Queensland’s valuable wind and solar resources will help keep the grid in a secure operating state and offer greater stability to Queenslanders.”

The battery is expected to start operating in the Australian summer of 2024/25.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

4th Annual Queensland Energy Conference

4th Annual Queensland Energy Conference

Battery Show

The Battery Show Asia – Indonesia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
24 Aug

NSW invests $1.5M to back skilled workers with renewable energy jobs

21 Aug

Renewables and battery growth drive down Australian wholesale power prices

21 Aug

APA to build $295M Sybella Creek solar farm and BESS in Mount Isa

19 Aug

NSW to cut power bills with new battery discounts for businesses

18 Aug

CATL and Quinbrook’s Supernode battery project begins commercial operation

19 Aug

New school building sets Passivhaus benchmark in New South Wales

14 Aug

Health groups call for hospital electrification funding

12 Aug

U.S. Green Building Council appoints David Purcell as CMO

05 Aug

NSW backs large-scale hemp manufacturing for housing with $2m grant

31 Jul

Closure of NSW lighting scheme creates gap for warehouses and industrial sites

24 Aug

Australia introduces new legislation to boost integrity in the carbon market

24 Aug

Australia sets first-ever National Environmental Standards

20 Aug

Fortescue produces first low-emissions metal at Christmas Creek

20 Aug

Euro Manganese signs term sheet with 6K Energy

14 Aug

Australian Vanadium, Alcoa partner to explore vanadium battery system for WA refineries

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required