Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Neoen expands the size of its Western Downs Battery

26 Jul, 2023
Western Downs



Neoen has announced the expansion of its Western Downs Battery in Queensland, which will have a total installed capacity of 270 MW / 540 MWh.

The expansion will be delivered by Tesla and construction contractor UGL who commenced construction of the initial stage of the project in January 2023.

The project is located on Barunggam country near the town of Chinchilla in South West Queensland.

With its greater capacity, the battery intends to play an even more central role in Queensland’s rapidly accelerating energy transition which is resulting in a growing need for storage and related network services.

Western Downs Battery, consisting of Tesla Megapack 2XL units, leverages the existing infrastructure of Neoen’s Western Downs Green Power Hub. The Hub includes Australia’s largest solar farm at 460 MWp capacity, which has recently been commissioned.

The will be capable of performing a range of network services to the Queensland grid, including firming renewables, providing frequency services and transmission network support.

With support from ARENA’s Large Scale Battery Storage Funding Round, the battery will ultimately be equipped with grid-forming inverter technology, allowing it to provide essential system stability services.

Queensland’s transmission network operator Powerlink will be delivering the project’s connection works and a dedicated high-voltage line into the Western Downs substation.

Powerlink Queensland CEO Paul Simshauser said: “Batteries will continue to play a critical role in the changing generation mix as we work towards a low emissions future.

“Increasing the capacity of Neoen’s Western Downs Battery to store Queensland’s valuable wind and solar resources will help keep the grid in a secure operating state and offer greater stability to Queenslanders.”

The battery is expected to start operating in the Australian summer of 2024/25.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

4th Annual Queensland Energy Conference

4th Annual Queensland Energy Conference

Battery Show

The Battery Show Asia – Indonesia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Sep

Octopus Australia submits proposal for Queensland BESS

09 Sep

Victorian solar company fined $100,000 for repeated fall risks

09 Sep

Tasmania releases draft rules for data centre and AI growth

08 Sep

ICC Sydney to host Southern Hemisphere’s largest CBD solar farm

08 Sep

EV sales overtake petrol cars for the first time in Australia

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

28 Aug

UNSW campus fit-out targets green interiors rating

28 Aug

New CDU pilot program turns waste into community resources

10 Sep

Australia’s environmental law reforms set to streamline project approvals, protect environment

09 Sep

Eni, PETRONAS partner to develop innovative biofuel solutions

09 Sep

Rendering transforms waste into billion dollar exports

03 Sep

ARENA backs green iron firm Element Zero with $26M funding

01 Sep

InCapture, Yara partner to explore offshore carbon storage hub in WA

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required