Subscribe to Newsletter
  • world esg summit

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

MacIntyre Wind Farm receives development approval

21 Apr, 2021
MacIntyre Wind Farm
Image courtesy of ACCIONA.


ACCIONA’s MacIntyre Wind Farm has achieved a significant milestone, with development approval granted by Queensland’s State Assessment and Referral Agency (SARA) to build the project.

The approval clears the way for the 1,026 megawatt MacIntyre Wind Farm Precinct to move to the next stage of development, with construction expected to start in the second half of 2021.

Forecasted to generate enough clean energy to power 700,000 Queensland households, the MacIntyre Precinct is set to become a major contributor to achieving the Queensland government’s goal of 50 per cent renewable energy by 2030.

Featuring 162 turbines, ACCIONA will build, own and operate the MacIntyre Wind Farm. The company will develop the project in partnership with Ark Energy Corporation, a subsidiary of Korea Zinc Co., and the Australian vehicle for its clean energy business.

In addition to this, the project will also see involvement from the Queensland Government’s own renewable energy generator, CleanCo. CleanCo will own and operate the adjacent Karara Wind Farm, which will house 18 turbines capable of producing up to 103 megawatts of power.

ACCIONA’s Australian Managing Director for Energy, Brett Wickham, said the MacIntyre Wind Farm represents the company’s largest-ever wind farm.

“We are excited to be moving forward with this project and are proud to support the Queensland Government’s decarbonisation strategy,” he said.

“The Precinct will avoid the emission of nearly three million tonnes of carbon dioxide each year, with construction slated to begin in the second half of 2021.”

“Up to 400 local jobs will be created during the construction phase, while the local supplier spend during this period is expected to exceed AU$500 million,” Mr Wickham commented.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

4th Annual Queensland Energy Conference

4th Annual Queensland Energy Conference

Smart Energy Queensland

Australia Wind Energy 2025

Floating Wind - Europe

Floating Wind – Europe

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
11 May

Victoria signs global agreement to transition to zero-emission freight

11 May

Yindjibarndi Energy reaches financial close on Jinbi solar project

08 May

Emerging tech pressures Australia’s vulnerable energy

08 May

NSW introduces law to speed up critical renewable projects

07 May

Victoria progresses its offshore wind ambitions by fast-tracking port development

07 May

NABERS Sustainability Index shows property firms’ commitment to sustainability

04 May

Eldercare Goodwood achieves 6 Star Green rating

01 May

Hospital trial cuts energy use by one‑third while keeping optimal air quality

23 Apr

Landlords turn to solar energy and storage as tax breaks wind back

22 Apr

Australia urged to make nation’s existing schools net zero

11 May

Australia’s High Court to hear nation’s first climate case

11 May

Fortescue proves green grid can withstand massive network disruption

08 May

Victoria partners with Viva Energy on renewable diesel expansion study

07 May

BSC forms national advisory panel ahead of stricter battery stewardship laws

06 May

Report shows carbon capture dominates Australian green investment

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • carbon capture and storage
  • Flow Batteries

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required