Subscribe to Newsletter
  • ACQUIRE
  • JAPAN ENERGY SUMMIT
  • World Hydrogen 2025

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

IGE acquires solar farm with hydrogen production targeted for 2024

02 Feb, 2023
IGE
Infinite Green Energy CEO Stephen Gauld (left) and chairman Peter Coleman at the Northam Solar Farm.


Australia’s first commercial-scale green hydrogen project is planned to commence production in the last quarter of 2024, after Infinite Green Energy (IGE) completed the acquisition of Perth’s Northam Solar Farm and signed its first offtake contract this week.

The completion of the $8 million Northam deal, funded by debt and investor capital, will allow IGE to leverage the 11MW solar farm to produce four tonnes a day of renewable hydrogen via electrolysis.

The hydrogen output will initially power Fuel Cell Electric Vehicle (FCEV) truck fleets for several key back to base customers, with the first binding supply agreement, signed yesterday with a Western Australian waste to energy refuge collection company.

Infinite Green Energy, chaired by former Woodside CEO Peter Coleman, will immediately commence a $3 million capital raising to fund production capacity of the Northam project (MEG HP1) and the pathway towards planned production of the company’s flagship, 23 tonne/day Arrowsmith project.

Mr Coleman said the strategic acquisition of the Northam Solar Farm and capital raising would allow IGE to progress the Northam project to final investment decision. The company plans to expand the Northam Solar Farm capacity to 18MW and connect a 10MW electrolyser for green hydrogen production in the second half of 2024.

In the meantime, he said, IGE would benefit from the Northam asset’s existing Power Purchase Agreement (PPA), which delivered immediate revenue to shareholders.

“The Northam Solar Farm was acquired through a competitive tender process for $8 million with today’s replacement cost of the asset being $18 million,” Mr Coleman said.

“With the security of a PPA in place, our clear path to initial production in 2024 will demonstrate the plant and help to initiate a market for green hydrogen in the commercial mobility sector in Western Australia.

“This completed acquisition of Northam will see the business producing at scale in an Australian first and cement IGE as the first and biggest commercial producer of green hydrogen.”

IGE founder and CEO Stephen Gauld said the business would promote the hydrogen ecosystem in Western Australia by supplying contracted customers and local fuel stations with green hydrogen, which was expected to facilitate FCEV demand in the local transport industry.

“We have our first contracted customer and six MOUs from other transport companies in Western Australia,” Mr Gauld said.

Adam Buckler (CFO) will work with Chloé Argyle of éthica capital to manage the capital raising, which is reserved for sophisticated investors.

Ms Argyle said the company’s offer aimed to raise $3 million, with oversubscriptions at its discretion, via the issue of 1.5 million new ordinary shares at AU$2.

Related Articles

Hydrogen Technology Conference & Expo

Hydrogen Technology Conference & Expo

Wood Mackenzie Hydrogen Conference

Wood Mackenzie Hydrogen Conference

Solar & Energy Storage Summit 2025

Solar & Energy Storage Summit 2025

SOLAR AND STORAGE LIVE QUEENSLAND

SOLAR AND STORAGE LIVE QUEENSLAND

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
08 May

WwP partner with Quenda to develop Marradong wind farm

28 Apr

Off-grid solar investment drops by 30 per cent in 2024

28 Apr

ACCIONA Energía completes Aldoga Solar Farm 7 months early

28 Apr

Resilience key to financing and insuring global renewable energy projects, FM survey finds

24 Apr

Collie battery construction reaches major milestone with all 640 batteries in place

29 Apr

Salta achieves first 5-Star Green Star industrial milestone

28 Apr

GCCA launches world’s first low carbon ratings system

24 Apr

City of Sydney unveils ambitious environmental strategy to reach net zero by 2035

24 Apr

ALP’s $2.3b home battery policy pledge receives mixed reactions

14 Apr

Sydney proposes all-electric future for new developments to cut emissions

08 May

Global energy mix shifts slowly toward cleaner alternatives

08 May

Clean energy mineral rush fuels rights abuses

29 Apr

Mitsui invests $1b in US low-carbon ammonia project

24 Apr

Collie’s industrial transformation accelerates with major project milestones

15 Apr

Australian innovation set to revolutionise sustainable bio-oil production

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • Hydrogen Economy Forum
  • FCON2025 FUTURE OF CONSTRUCTION

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required