Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Hydropower should enable Laos to expedite renewables development

27 Jan, 2023
Laos



With supply security through hydropower and being a net exporter of electricity, Laos has the capacity to expedite renewables development depending on funding support from developed countries, as it targets to achieve 30 per cent of its energy consumption from renewable sources by 2025, says GlobalData.

GlobalData’s Laos Power Market Size, Trends, Regulations, Competitive Landscape and Forecast, 2022-2035 report reveals that Laos’ total annual generation was recorded at 36.8 TWh in 2021, with 27.5 TWh of that capacity exported to neighbouring countries and only 8 TWh consumed domestically.

Due to its positioning within the Mekong River, Laos has a huge hydropower potential of 23 GW, as per government estimates. Currently, hydropower capacity in the country is 9.6 GW. There are several upcoming hydropower projects aimed at electricity exports.

Attaurrahman Ojindaram Saibasan, Power Analyst at GlobalData, comments: “Laos is diversifying its power mix through renewable expansion particularly hydro, solar and wind. The country also has set a conditional target to achieve 1 GW of total solar and wind capacity and 300 MW of biopower capacity by 2030 depending on the level of support it receives from developed countries. As per current estimates, the country is expected to achieve 0.6 GW solar PV capacity and 150 MW biopower capacity by 2030 falling short of its targets.”

However, Laos has shifted towards coal power in recent years, as it struggles with a massive sovereign debt of $12.6 billion that makes it difficult for the country to avoid the expansion of coal-powered plants. In March 2021, the government signed a $2 billion agreement with Electricite du Laos Transmission Company Ltd. (EDLT), a Chinese owned company to manage a significant part of Lao’s power grid for the next 25 years.

Saibasan concludes: “Laos is looking towards foreign investments for renewable power development to avoid coal-power expansion. The country currently has a project pipeline of 3.4GW of wind capacity, over 1GW utility-scale solar PV capacity, and over 9.1GW hydropower capacity.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Connecting Green Hydrogen MENA 2024

Australian PV Institute

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Jan

Fortescue begins construction on first wind project

14 Jan

Solar and wind farms spill power amid oversupply

14 Jan

Neoen advances 500 MW Wheatbelt wind project

12 Jan

First stage of Eraring battery starts commercial operations

09 Jan

Japan’s first floating offshore wind farm starts operations

19 Jan

WA unveils landmark Urban Greening Strategy

15 Jan

Cement kilns safely transform unrecyclable global waste

14 Jan

2025 marked peak Green Star sustainability in Australian buildings

19 Dec

RICS report shows AI could boost green infrastructure

17 Dec

CEFC urges investors to lead green data centres growth

20 Jan

Monash scientists develop greener battery recycling

16 Jan

Rio Tinto to supply Amazon with low-carbon copper for AI data centres

16 Jan

Prometheus reveals breakthrough process for synthetic kerosene   

14 Jan

‘Breathing batteries’ store energy and carbon

14 Jan

New project advances Iron Nitride magnet production

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required