Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Genex achieves energisation of Bouldercombe Battery Project

28 Jun, 2023
Bouldercombe



Genex Power Limited has achieved energisation for the 50MW/100MWh Bouldercombe Battery Project (BBP), located near Rockhampton, Queensland. The milestone enables the project to begin the commissioning phase ahead of full operations commencing.

Genex partners Powerlink, Consolidated Power Projects and Tesla Motors Australia Pty Ltd have concluded the tasks required to allow the commissioning phase of the project to commence, including successful energisation of the Powerlink transformer and high voltage balance of plant components and initial energisation of the Megapack units.

The commissioning phase will be completed over the coming months to ensure it is fully operational ahead of the peak demand summer season. Genex will receive revenues from the project during this phase.

Following completion of commissioning, the project will be operated under the Autobidder Offtake Agreement with Tesla.

Under this Agreement, Tesla will operate the plant to maximise revenues in the energy arbitrage and frequency control ancillary services markets, while providing a guaranteed minimum level of revenues.

The upside above this minimum level is largely captured by Genex with a portion shared with Tesla to align incentives between the parties. This ensures that Genex directly participates in the revenue upside from significant volatility and wholesale market pricing events.

Energisation of the BBP is a significant achievement for Genex, delivering the company’s first largescale Battery Energy Storage System.

The project is one of the first large-scale battery energy storage systems to be connected in Queensland and will store and supply up to 35,200MWh per annum.

The BBP will also provide the required ancillary services to support the security and reliability of the Queensland grid, while boosting the company’s existing revenue, earnings and cash flow.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Battery Asset Management Summit Australia 2026

Battery Asset Management Summit Australia 2026

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
07 Oct

Origin lodges plans to expand Eraring BESS

07 Oct

Australia’s battery subsidies drives focus to usage sizing over rebate chasing

07 Oct

Neoen commences construction of 346 MW Goyder North Wind Farm

06 Oct

Australia moves to deliver Marinus Link to connect Tasmania and Victoria

05 Oct

Atmos Renewables reaches financial close on 1 GW of renewable energy projects

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

18 Sep

Bamboo breakthrough could reshape Australian construction materials

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

28 Sep

Coal exits put Australia’s grid reliability to the test

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required