Subscribe to Newsletter
  • world esg summit

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Genex achieves energisation of Bouldercombe Battery Project

28 Jun, 2023
Bouldercombe



Genex Power Limited has achieved energisation for the 50MW/100MWh Bouldercombe Battery Project (BBP), located near Rockhampton, Queensland. The milestone enables the project to begin the commissioning phase ahead of full operations commencing.

Genex partners Powerlink, Consolidated Power Projects and Tesla Motors Australia Pty Ltd have concluded the tasks required to allow the commissioning phase of the project to commence, including successful energisation of the Powerlink transformer and high voltage balance of plant components and initial energisation of the Megapack units.

The commissioning phase will be completed over the coming months to ensure it is fully operational ahead of the peak demand summer season. Genex will receive revenues from the project during this phase.

Following completion of commissioning, the project will be operated under the Autobidder Offtake Agreement with Tesla.

Under this Agreement, Tesla will operate the plant to maximise revenues in the energy arbitrage and frequency control ancillary services markets, while providing a guaranteed minimum level of revenues.

The upside above this minimum level is largely captured by Genex with a portion shared with Tesla to align incentives between the parties. This ensures that Genex directly participates in the revenue upside from significant volatility and wholesale market pricing events.

Energisation of the BBP is a significant achievement for Genex, delivering the company’s first largescale Battery Energy Storage System.

The project is one of the first large-scale battery energy storage systems to be connected in Queensland and will store and supply up to 35,200MWh per annum.

The BBP will also provide the required ancillary services to support the security and reliability of the Queensland grid, while boosting the company’s existing revenue, earnings and cash flow.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

International Flow Battery Forum (IFBF®)

International Flow Battery Forum (IFBF®)

Battery Show

The Battery Show Asia – Indonesia

Battery Asset Management Summit 2025

Battery Asset Management Summit Australia

Aggreko

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
14 May

New Zealand launches solar installation review to reduce costs for households

13 May

Europe’s offshore wind industry faces turbine supply crunch

11 May

Victoria signs global agreement to transition to zero-emission freight

11 May

Yindjibarndi Energy reaches financial close on Jinbi solar project

08 May

Emerging tech pressures Australia’s vulnerable energy

07 May

NABERS Sustainability Index shows property firms’ commitment to sustainability

04 May

Eldercare Goodwood achieves 6 Star Green rating

01 May

Hospital trial cuts energy use by one‑third while keeping optimal air quality

23 Apr

Landlords turn to solar energy and storage as tax breaks wind back

22 Apr

Australia urged to make nation’s existing schools net zero

14 May

ARENA spearheads $1.1B program to build out Australia’s low‑carbon liquid fuels industry

13 May

Lion Energy terminates Port of Brisbane hydrogen project over challenging conditions

13 May

IonicRE produces rare earth magnets from recycled materials to commercial standards

13 May

Nanocomposite membrane transforms PET recycling process

11 May

Australia’s High Court to hear nation’s first climate case

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter
  • carbon capture and storage
  • Flow Batteries

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required