Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

ENGIE starts construction on one of Europe’s largest battery storage systems

09 Jul, 2024
ENGIE commences construction on one of Europe's largest Battery Energy Storage Systems in Belgium



ENGIE has begun the construction of one of Europe’s largest battery energy storage systems (BESS) at its Vilvoorde site in Belgium.

This significant milestone follows the project’s construction permit approval in July 2023 and its selection for capacity remuneration in October 2023.

The BESS Vilvoorde project, with an installed capacity of 200 MW, spans a 3.5-hectare site and will be capable of storing 800 MWh of energy in 320 battery modules, each measuring 25 metres by 4 metres by 3 metres.

This system will be able to release stored energy to the grid for up to four hours, equivalent to the capacity of 160,000 5 kWh domestic batteries, and will cover the electricity consumption of approximately 96,000 households.

The battery park has secured a 15-year contract with Elia, Belgium’s national grid operator.

The project will be executed in two phases, with the first 100 MW of batteries set to be commissioned in September 2025, followed by an additional 100 MW in January 2026.

ENGIE is also advancing two other BESS projects in Belgium, with permits already obtained for sites in Kallo (100 MW / 400 MWh) and Drogenbos (80 MW / 320 MWh).

Sébastien Arbola, Executive Vice President in charge of Flex Gen & Retail activities at ENGIE, emphasised the critical role of Battery Energy Storage Systems in the context of increasing renewable energy integration.

“With the growing share of renewable energies in the energy mix, the contribution of Battery Energy Storage Systems to ensuring the reliability and security of energy systems is becoming crucial.

“Batteries will enable the absorption of peaks in renewable energy production and the release of this energy when production is lower and consumption higher.

“These flexibility solutions will thus help accelerate the development of renewable energies and the energy transition,” Arbola stated.

The BESS Vilvoorde project aligns with ENGIE’s commitment to developing large-scale flexibility solutions, which are essential for integrating renewable energy production.

ENGIE aims to achieve 10 GW of installed battery capacity worldwide by 2030. As of December 31, 2023, ENGIE had 1.3 GW of battery capacity in operation and 3.6 GW secured under development.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Raw Materials Summit

Connecting Green Hydrogen Europe 2024

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
23 Oct

Kimberley Communities Solar Saver delivers more than $240,000 in energy savings

21 Oct

Global battery emissions could double by 2050

19 Oct

Hazelwood battery expansion to support Gippsland clean energy transition

19 Oct

Atmos Renewables expands clean energy portfolio with BayWa r.e. projects 

16 Oct

Victoria gives green light to Southern Hemisphere’s largest wind farm

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

21 Oct

Australian Passivhaus certifications quadruple in four years

21 Oct

NSW finalists announced for Sustainable Cities Awards 2026

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

23 Oct

NeoSmelt, HILT CRC to advance Australian lower-emissions ironmaking

22 Oct

ARENA backs Australia’s largest thermal energy storage project at Rio Tinto alumina refinery

20 Oct

World’s first commercial ship-to-ship green ammonia refuelling completed in China

19 Oct

Australia approves West Peron Formation for Bonaparte carbon storage project

14 Oct

Carbonxt secures expanded US supply deal, boosting FY27 outlook

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required