Construction has commenced on Western Australia’s first-ever fleet of electric ferries, with a keel laying ceremony marking the start of vessel construction.
Five new electric ferries are being designed and built by Henderson-based shipbuilder Echo Marine Group as part of the AU$107 million project, with the new services expected to be operational from late 2027.
The project represents a shift toward cleaner, quieter, and more sustainable commuter options. The use electric vessels mirrors highly successful operations overseas, providing a highly cost-effective and low-emission alternative to traditional diesel transport.
Each of the state-of-the-art ferries will accommodate up to 100 passengers, boasting a maximum operating speed of 25 knots and a custom, low-wake design to protect the Swan River’s riverbanks.
Commuters can expect a modern and accessible experience, with onboard toilet facilities, dedicated bike storage, and external seating options.
WA Premier Roger Cook said the project delivers on his government’s absolute commitment to supporting onshore manufacturing.
“The new electric METRONET on Swan ferry project harnesses our state’s shipbuilding sector by supporting local businesses and creating local jobs and training opportunities,” Premier Cook said.
Around 130 local workers, including fabrication, mechanical, and electrical apprentices, are expected to be employed across the construction phase.
WA Transport Minister Rita Saffioti said: “It’s incredibly exciting to see construction get underway on our new electric ferry fleet that will underpin the biggest ever expansion of ferry services on the Swan River.
“By building electric ferries in WA for the first time we’re not only supporting local jobs but strengthening our state’s shipbuilding capability for the future.”
To accommodate the expanded fleet, substantial marine infrastructure upgrades are also underway.
Tenders are currently open until August 11 for a single contractor to design and construct two new matching ferry terminals at Applecross and Matilda Bay.
Additionally, expansions are progressing at the Elizabeth Quay ferry terminal and Barrack Square Jetty to support overnight berthing and rapid shore-based charging.