Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Construction begins on Tilt Renewables Palmer wind farm in South Australia

09 Jul, 2026
Public and private investment vital to unlock Australia's renewables potential



Construction has commenced on the 288-megawatt (MW) Palmer Wind Farm, located 70 kilometres east of Adelaide.

Developed by renewable energy company Tilt Renewables, the clean energy project is set to provide a substantial boost to South Australia’s electricity grid.

The project will take approximately two years to complete. Once fully operational, the wind farm will generate enough renewable energy to power up to 142,000 homes annually.

Tilt Renewables CEO Anthony Fowler said: “The start of construction is a major milestone for Palmer Wind Farm and follows more than a decade of planning, consultation and design refinement.

“Over this time, we’ve worked hard to reduce its environmental and community impacts, cutting the number of turbines from 103 down to 40 while maintaining a similar energy output.”

Fowler noted that the company has prioritised local engagement, working closely with the local council, traditional owners, landholders, and neighbours. Over the life of the project, neighbours, First Nations people, and the broader local community are expected to receive more than AU$13 million in direct benefits.

Initial construction activities on-site are kicking off the week of July 6. Early works will primarily involve site preparation, including establishing access points, constructing the internal track network, and erecting site offices.

Tilt Renewables has pledged to do everything possible to mitigate construction-related disruptions for nearby residents, focusing heavily on minimising noise and heavy traffic.

To ensure ongoing community engagement, the developer will host monthly drop-in sessions throughout the construction phase.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
10 Jul

NSW invests $25M to build the clean energy workforce

09 Jul

Meridian receives final approval for hydro storage at Lake Pūkaki project

09 Jul

NSW’s Dinawan solar farm gets environmental approval

09 Jul

CleanPeak Energy to power Western Sydney International Airport with 100% renewable electricity

09 Jul

European Energy achieves financial closing for Winton North project in Victoria

07 Jul

First Nations cultural centre wins 2026 Living Future Oceania Biophilic Design Awards

29 Jun

Climate report warns UK buildings are not cutting emissions

25 Jun

New AI platform expands solar access in apartments

24 Jun

CAGBC formalises board to guide sustainable building future

23 Jun

Tasmania increases funding for waste and resource recovery projects

10 Jul

Queensland invests in state-of-the-art biofuels hub in Brisbane

07 Jul

ARENA funds sustainable aviation fuel at Brisbane Airport

07 Jul

RMIT researchers develop low-cost method to separate microplastics from wastewater

02 Jul

Hunter Valley Hydrogen Hub moves ahead with Orica

01 Jul

Orica green lights ARENA-backed Hunter Valley hydrogen hub

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required