Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

CIMIC Pacific Partnership acquires large scale solar farm in VIC

14 Jun, 2022
A renewable first for First Peoples in Victoria



CIMIC Group company Pacific Partnerships has acquired the development rights for Glenrowan Solar Farm in northern Victoria, the first large-scale solar farm to be owned and developed by CIMIC Group as principal.

Pacific Partnerships, through its energy business, Pacific Partnerships Energy, will develop, invest in, and manage Glenrowan Solar Farm, with CIMIC Group company UGL to undertake construction, operations and maintenance.

CIMIC Group executive chairman Juan Santamaria said: “CIMIC is committed to supporting Australia’s energy transition, and is pursuing large-scale renewable generation, storage and generation assets.

“Pacific Partnerships is actively driving our strategic expansion into the emissions free, renewable energy sector.”

Pacific Partnerships managing director Simon Nicholls said: “The acquisition of the development rights to Glenrowan Solar Farm is part of our strategy to establish a diversified portfolio of energy and utilities assets within the National Electricity Market.”

The 245-hectare solar farm will generate an installed capacity of up to 125 MW and is proposed to connect to the existing nearby Glenrowan Terminal Substation.

It is expected to generate enough independent electricity to power approximately 45,000 Australian homes.

Glenrowan Solar Farm development rights were purchased from leading Australian renewable energy developer and asset manager, ESCO Pacific. Grid connection and services agreements are in place with the Victorian transmission network operator (AusNet) and the Australian Energy Market Operator (AEMO).

UGL is currently undertaking early works for the project, including design, procurement and construction planning with operations and renewable energy generation expected to commence from the end of 2023.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
07 Oct

Origin lodges plans to expand Eraring BESS

07 Oct

Australia’s battery subsidies drives focus to usage sizing over rebate chasing

07 Oct

Neoen commences construction of 346 MW Goyder North Wind Farm

06 Oct

Australia moves to deliver Marinus Link to connect Tasmania and Victoria

05 Oct

Atmos Renewables reaches financial close on 1 GW of renewable energy projects

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

18 Sep

Bamboo breakthrough could reshape Australian construction materials

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

28 Sep

Coal exits put Australia’s grid reliability to the test

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required