Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

ARENA commits to Australian solar farm robot manufacturing

14 Oct, 2026
New guide shows how solar farms can boost biodiversity



The Australian Renewable Energy Agency (ARENA) has committed up to AU$31.1 million to establish automated solar manufacturing facilities across Melbourne and Brisbane.

Awarded under Round 2 of ARENA’s AU$850 million Solar Sunshot Program, the funding supports the production of complementary robotic technologies designed to make large-scale solar farm development faster, safer, and cheaper.

The funding will see Luminous Robotics receive up to AU$17.8 million to build a manufacturing facility in Melbourne for its LUMI autonomous panel-installation robots.

Emerging from ARENA’s 2024 Solar Challenge, Luminous has already trialled the LUMI robots under harsh field conditions in Victoria and New South Wales. The new site aims to produce and deploy roughly 100 LUMI units by 2029.

Simultaneously, Built Robotics Australia was awarded up to AU$13.3 million to establish a Brisbane manufacturing hub and operations centre.

The facility will manufacture and deploy 12 autonomous piling systems, automating the labour-intensive process of driving foundation piles into the ground for utility-scale solar projects.

ARENA CEO Darren Miller said foundation piling and panel placement are two of the most physically demanding, labour-intensive aspects of solar farm construction.

“Australia needs to install large volumes of solar quickly and cost-effectively,” Miller said.

“Local manufacturing and automation can improve the way solar farms are built by reducing construction costs and making installation faster, safer and more efficient; an important part of ARENA’s ultra-low-cost solar vision.”

Luminous Robotics Australia General Manager Tenzin Crouch said robotics will play a vital role in achieving the speed and scale required for Australia’s clean energy transition.

Built Robotics Vice President of Business Development Paul Kelly noted that the Brisbane facility will secure Queensland as a central hub for autonomous solar construction and local physical AI manufacturing.

The Solar Sunshot Program aims to support innovation in Australia’s solar PV manufacturing industry. The program was announced by the Australian government in March 2024 and seeks to uncover and support innovation to drive scale and diversity in a critical industry.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

AUSTRALIAN RENEWABLE ENERGY AGENCY – ARENA

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required