Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

All 30 wind turbines erected for Warradarge wind farm

12 Aug, 2026



Bright Energy Investments (BEI) has reached a major project milestone near Eneabba, Western Australia, with all 30 wind turbines now erected for Stage 2 of the Warradarge wind farm.

The installation of the final turbine brings the facility’s total count to 81 turbines and marks a key step toward making the expanded site fully operational later this year.

Once online, the development will boast a combined generation capacity of 283 megawatts (MW), establishing it as the largest wind farm in Western Australia.

“Warradarge Wind Farm is already recognised as one of Australia’s best-performing wind farms, and this expansion will significantly increase the amount of renewable energy it can generate for homes and businesses in the South West Interconnected System (SWIS),” said BEI Executive General Manager Tom Frood.

“We are proud to be investing in infrastructure that supports Western Australia’s energy transition, creates jobs, and delivers long-term benefits for regional communities.”

The Stage 2 expansion supported more than 120 jobs at the peak of construction.

Built amongst the existing 51 turbines, the new units feature a tip height of 152 metres and 67-metre blades anchored into solid concrete foundations.

Potentia Energy CEO Werther Esposito described the milestone as a pivotal achievement for Australia’s broader clean energy transition.

“This is a milestone not just for Western Australia, but for the entire nation’s transition toward reaching our clean energy potential,” Esposito said.

“Warradarge Wind Farm already sets the benchmark for what can be achieved in project design and management. Potentia Energy is proud of what has been achieved here with Synergy, our joint-venture partner, and we are excited for the future.”

BEI is a joint venture between Potentia Energy and the WA state government through Synergy.

Power generated across the 3,800-hectare site feeds into the SWIS grid via a 10-kilometre transmission line and dedicated terminal station at Eneabba, constructed by Western Power.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
14 Oct

ARENA commits to Australian solar farm robot manufacturing

14 Oct

TotalEnergies and KKR expand US solar JV with $1.2B deal

14 Oct

King Island wind farm upgrade complete, extends operational life

13 Oct

Contract awarded for landmark solar system at Western Sydney Airport

13 Oct

LGI grows portfolio through two Queensland solar farm acquisitions

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

09 Oct

AGL partners with Bega Group for large-scale rooftop solar project

07 Oct

Solar integration sets a new benchmark at Western Sydney International Airport

06 Oct

KGBS opens green building finance repository platform

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

14 Oct

Carbonxt secures expanded US supply deal, boosting FY27 outlook

13 Oct

Japanese energy giant opens $200M Queensland green hydrogen facility

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required