Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

All 30 wind turbines erected for Warradarge wind farm

12 Aug, 2026



Bright Energy Investments (BEI) has reached a major project milestone near Eneabba, Western Australia, with all 30 wind turbines now erected for Stage 2 of the Warradarge wind farm.

The installation of the final turbine brings the facility’s total count to 81 turbines and marks a key step toward making the expanded site fully operational later this year.

Once online, the development will boast a combined generation capacity of 283 megawatts (MW), establishing it as the largest wind farm in Western Australia.

“Warradarge Wind Farm is already recognised as one of Australia’s best-performing wind farms, and this expansion will significantly increase the amount of renewable energy it can generate for homes and businesses in the South West Interconnected System (SWIS),” said BEI Executive General Manager Tom Frood.

“We are proud to be investing in infrastructure that supports Western Australia’s energy transition, creates jobs, and delivers long-term benefits for regional communities.”

The Stage 2 expansion supported more than 120 jobs at the peak of construction.

Built amongst the existing 51 turbines, the new units feature a tip height of 152 metres and 67-metre blades anchored into solid concrete foundations.

Potentia Energy CEO Werther Esposito described the milestone as a pivotal achievement for Australia’s broader clean energy transition.

“This is a milestone not just for Western Australia, but for the entire nation’s transition toward reaching our clean energy potential,” Esposito said.

“Warradarge Wind Farm already sets the benchmark for what can be achieved in project design and management. Potentia Energy is proud of what has been achieved here with Synergy, our joint-venture partner, and we are excited for the future.”

BEI is a joint venture between Potentia Energy and the WA state government through Synergy.

Power generated across the 3,800-hectare site feeds into the SWIS grid via a 10-kilometre transmission line and dedicated terminal station at Eneabba, constructed by Western Power.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Sep

Octopus Australia submits proposal for Queensland BESS

09 Sep

Victorian solar company fined $100,000 for repeated fall risks

09 Sep

Tasmania releases draft rules for data centre and AI growth

08 Sep

ICC Sydney to host Southern Hemisphere’s largest CBD solar farm

08 Sep

EV sales overtake petrol cars for the first time in Australia

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

28 Aug

UNSW campus fit-out targets green interiors rating

28 Aug

New CDU pilot program turns waste into community resources

10 Sep

Australia’s environmental law reforms set to streamline project approvals, protect environment

09 Sep

Eni, PETRONAS partner to develop innovative biofuel solutions

09 Sep

Rendering transforms waste into billion dollar exports

03 Sep

ARENA backs green iron firm Element Zero with $26M funding

01 Sep

InCapture, Yara partner to explore offshore carbon storage hub in WA

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required